My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55D - BIKEWAYS STRATEGIC PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
11/02/2009
>
55D - BIKEWAYS STRATEGIC PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 11:22:16 AM
Creation date
10/29/2009 10:48:03 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.3. Performance Criteria <br />The input received through the outreach process also served to identify project performance criteria <br />that can be used by local jurisdictions to prioritize their projects listed in this plan, as well as future <br />projects. The following criteria should be considered in the order of the Tiers in which they are <br />listed: <br />Tier 1: <br />Safety — Projects that reduce conflicts between motorists and cyclists, and address other safety <br />concerns. <br />Ease of implementation — Projects with an anticipated low difficulty for implementation, based on <br />available rights -of -way, existing traffic operations, and other similar factors. <br />Continuity — Projects that improve continuity within the route, or between routes. <br />Tier 2: <br />Regional signcance — Projects that will benefit the overall region by addressing regional priorities <br />identified within this plan. <br />Accessibility — Projects that provide one or more points of access to regional destinations. <br />Support facilities and programs — Projects that include any of the following support facilities or programs: <br />bicycle parking (including lockers) <br />signage /street markings <br />signal detection (buttons and /or in- ground) <br />lighting <br />bicycle sharing programs <br />=x restrooms /drinking fountains <br />other similar facilities <br />Tier 3: <br />Directness — Projects that provide the most direct route between origins and destinations. <br />Route aesthetics — Projects that provide for visual aesthetics, increased comfort, a sense of personal <br />safety, and /or other similar factors along the facility. <br />Public Support — Projects that appear to be supported by the public input received in the development <br />of this plan, through letters of support, or other means of public input. <br />14 OCTA Commuter Bikeways Strategic Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.