My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-11-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
11/02/2009
>
FULL PACKET_2009-11-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 11:00:21 AM
Creation date
10/29/2009 5:30:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
11/2/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
550
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ValleyCom Statement of Work <br />5.3.2 FIRE OR EMS BOUNDARIES <br />Maximum 1. A complete rebuild of a response polygon Layer is considered part of a Release as long <br />Limits <br />as it does not occur more often than once every 2 years. If Licensee has the need to <br />completely rebuild polygon boundaries more often than once every 2 years.. this may be <br />incorporated into future Specifications at an additional cost. <br />2. Geometry changes for up to 40% of the records in a response boundary file may be <br />performed before the Maximum Limit is exceeded. <br />I Spatial - <br />Accuracy y 1. Any boundary work will be digitized and /or corrected to the street centerlines and other <br />relevant features with respect to the most recent aerial imagery that GDR can obtain. If <br />roads are so new that they do not appear on any imagery, GDR will then align <br />boundaries using reasonable commercial efforts with the understanding that the Layer <br />will be corrected to spatially accurate centerlines and imagery in a subsequent Release <br />when said imagery becomes available to GDR. <br />2 Any original boundary work found later to be in error in the original base map, will be <br />corrected without counting against the Maximum Limit. <br />3 All polygon boundaries that are to be coincident with the street centerline (i.e. exactly <br />divide the street into a left and right half) will be completely coincident with the centerline <br />where specified by Licensee. <br />Attribution In the event of a complete rebuild of polygon boundaries, there is no limit to the number of <br />polygon records permissible for Update. <br />8 Digital Drive, Suite 200. Novato. CA 94949 - (888) 654 -4GDR (4437) - Phone (415) 884 -4437 - FAX (415) 884 -4407 <br />www.qdr.com <br />Page 4 of 7 <br />25A -9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.