My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HOUSTON HARRIS PCS, INC. 3 - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
HOUSTON HARRIS PCS, INC. 3 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2019 12:18:33 PM
Creation date
11/13/2009 11:49:31 AM
Metadata
Fields
Template:
Contracts
Company Name
HOUSTON HARRIS PCS, INC.
Contract #
A-2009-141
Agency
PUBLIC WORKS
Council Approval Date
9/8/2009
Insurance Exp Date
6/24/2012
Destruction Year
2018
Notes
Amended by A-2010-112, A-2011-181, A-2012-108
Document Relationships
HOUSTON HARRIS PCS, INC. 3C - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
HOUSTON-HARRIS PCS INC. 3B - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan <br />line is deemed to be unsadafsaory, the line is rejected and reinspected. After the lines <br />have passed the QC process they are saved on multiple hard drives ensuring nothing is <br />lost if the working hard drive should fail. <br />Once this step is complete all line segments are logged on an Excel Spreadsheet. This <br />spreadsheet shows progress of our currant task and includes important information we <br />feel the City should be aware og including RVP information, Red Flags, etc. Any lines <br />having major defects or need immediate sq action from the City will be forwarded to the <br />props' personnel as a Red IW <br />The deliverables process consists of four steps. The first step requires breaking down the <br />cement task into folders with unique database numbers provided by the City. Each folder <br />will contain videos, ipegs, and MS Database & PDF reports. The second step involves <br />checking the database for blank gaps or unnecessary information. This ensures a smooth <br />transition when merging the data into the City's system. The third step consists of <br />printing the Lard copy report along with a summary report for each line segment. This <br />summary report includes the operator, dated from and to manhole mrmbers, pipe size, <br />material and length lmspected. During this process the PDF -reports are generated using <br />Adobe Acrobat. Thu final step entails converting the original hvipegl videos into the <br />City's standard WMV video. The video size will be reduced to about 15% of the original <br />size while still providing a high quality video. After the completion of this step all .data <br />will be put on a standard USB 2.0 hard drive and delivered to the City for review. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.