My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC COAST CABLING - 2009
Clerk
>
Contracts / Agreements
>
P
>
PACIFIC COAST CABLING - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:18:09 PM
Creation date
11/20/2009 11:36:04 AM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC COAST CABLING
Contract #
A-2009-148
Agency
Finance & Management Services
Council Approval Date
9/8/2009
Expiration Date
8/30/2011
Insurance Exp Date
1/1/2010
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />APPENDIX A <br />(Continued) <br /> <br />Proposal Response Form <br /> <br />Sample Job #1: <br /> <br />Scope of Work: Provide and install (4) Category 5e cables, at 200 feet each, to the same <br />location in an air return ceiling area. Two cables will be terminated into a contractor- <br />provided 24-port patch panel on one-side and 8P8C-type Category 5e modules on the <br />station side; the other two cables will be terminated into a contractor-provided 300FT 110- <br />block assembly and again 8P8C-type Category 5e modules on the station side. Assume a <br />clear path in the ceiling to the patch panel and the station side, utilizing Erico J-hooks in <br />the ceiling for cable pathway support. On the station side, assume there is flex conduit <br />running from a single gang outlet box to the top of the wall, in a stub-out fashion. <br /> <br />1) Provide a breakdown of hours to be billed. <br /> <br />Place Cable 3.92 <br />Terminate station 1.14 <br />Terminate closet .33 <br />Test .40 <br />Total Hours 5.80 <br /> <br />2) Provide a breakdown of cost of materials. <br />See attached oricina sheet. <br /> <br />3) Provide details and amounts of any and all other charges that would be billed to the <br />City. <br /> <br />See attached oricina sheet. <br /> <br />4) Provide approximation of elapsed time to complete work, beginning from authorization <br />to final acceptance. <br /> <br />72 hours <br /> <br />Page 22 of 36 <br /> <br />-'J <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.