Laserfiche WebLink
<br />APPENDIX A <br />(Continued) <br /> <br />Proposal Response Form <br /> <br />Sample Job #1: <br /> <br />Scope of Work: Provide and install (4) Category 5e cables, at 200 feet each, to the same <br />location in an air return ceiling area. Two cables will be terminated into a contractor- <br />provided 24-port patch panel on one-side and 8P8C-type Category 5e modules on the <br />station side; the other two cables will be terminated into a contractor-provided 300FT 110- <br />block assembly and again 8P8C-type Category 5e modules on the station side. Assume a <br />clear path in the ceiling to the patch panel and the station side, utilizing Erico J-hooks in <br />the ceiling for cable pathway support. On the station side, assume there is flex conduit <br />running from a single gang outlet box to the top of the wall, in a stub-out fashion. <br /> <br />1) Provide a breakdown of hours to be billed. <br /> <br />Place Cable 3.92 <br />Terminate station 1.14 <br />Terminate closet .33 <br />Test .40 <br />Total Hours 5.80 <br /> <br />2) Provide a breakdown of cost of materials. <br />See attached oricina sheet. <br /> <br />3) Provide details and amounts of any and all other charges that would be billed to the <br />City. <br /> <br />See attached oricina sheet. <br /> <br />4) Provide approximation of elapsed time to complete work, beginning from authorization <br />to final acceptance. <br /> <br />72 hours <br /> <br />Page 22 of 36 <br /> <br />-'J <br />I <br />