My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORDOBA CORPORATION 2
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
CORDOBA CORPORATION 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2015 4:28:23 PM
Creation date
11/25/2009 11:43:31 AM
Metadata
Fields
Template:
Contracts
Company Name
CORDOBA CORPORATION
Contract #
A-2009-122
Agency
Public Works
Council Approval Date
8/3/2009
Expiration Date
12/31/2011
Insurance Exp Date
1/20/2013
Destruction Year
2018
Notes
Amended by A-2011-272, A-2012-137, -01, A-2009-122-01, -02, -03
Document Relationships
CORDOBA CORPORATION 2A
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
CORDOBA CORPORATION 2B
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
CORDOBA CORPORATION 2C
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
CORDOBA CORPORATION 2D
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
CORDOBA CORPORATION 2E
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
CORDOBA CORPORATION 2F
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Socioeconomic Impact Analysis, Population, Housing, & Environmental Justice - <br />A socioeconomic and environmental justice analysis will be prepared consistent with the <br />CEQ and Presidential Executive Orders. The assessment of environmental justice <br />issues will involve a cumulative impacts assessment and will be completed just prior to <br />the Administrative Draft EIS/EIR. In addition, the Cordoba team will develop a summary <br />of the socioeconomic analysis conducted as part of the economic/financial task for the <br />project for inclusion in the community sections of the Administrative Draft EIS/EIR. <br />Deliverable(s) - Socioeconomic Impact Analysis Population Housing & <br />Environmental Justice technical report with analysis for incorporation <br />into the EIS/EIR. <br />• Transportation and Circulation Impacts - The transportation impacts, including transit, <br />traffic circulation and parking, will be summarized in a DE/S/DE/R Traffic Circulation and <br />Parking Technical Report to provide information to evaluate the proposed alignment <br />alternatives against the base or no -project alternative. The evaluation of transportation <br />impacts will include the following: <br />- Evaluation of Existing Traffic Conditions: The existing traffic conditions will be <br />evaluated and assessed at up to 40 key study area intersections as identified in the <br />scoping task. An existing conditions assessment of on -street parking will be <br />compiled to identify supply and occupancy within the neighborhood parking impact <br />area at each proposed station site. Within each station area, the existing number of <br />spaces will be identified along with the duration of occupancy to be compiled in <br />summary tables and figures. <br />- Evaluation of Future Base Traffic Conditions without the Project: The project <br />horizon year (2035) conditions without the project (No Build alternative) will be <br />evaluated using the future base traffic conditions from OCTA's travel forecasting <br />model that will account for background growth in traffic due to land use development <br />and population growth. The highway traffic volume projections will be post - <br />processed at each study intersection to develop the peak hour turning movement <br />projections. The intersection levels of service will be summarized and reported to <br />provide a base line comparison for the project alternatives. <br />- Evaluation of Future Traffic Conditions with Project Alternatives: Using the <br />highway traffic data provided by OCTA's travel forecasting model for each alterative <br />alignment scenario, peak hour turning movement projections will be developed at <br />study intersections that will provide the future "with project" conditions. Additional <br />impacts associated with potential reduction of automobile trips, restriction of turning <br />movements, driveway impacts, potential loss of on -street loading zones, and <br />diversion of vehicles into neighborhoods will also be addressed in the analysis. The <br />results of the analysis will be summarized and reported for easy comparison <br />between the different project alternatives and the No Build alternative. <br />Identification of Significant Project Impacts and Recommended Mitigation <br />Measures: Impacts generated by the project alternatives will be identified through <br />comparing the results of the No Build and "with project" alternatives through changes <br />or differences in level of service designations and volume to capacity ratios. The <br />mitigation measures will be identified for each study intersection by project <br />alternative, including construction activities of the alternative, in a matrix that <br />identifies the extent of the physical improvements (restriping, intersection and street <br />widening, right of way, etc.). <br />30 1 P a e <br />
The URL can be used to link to this page
Your browser does not support the video tag.