My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - CUP 2009-19 - 202 EAST FIRST STREET
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
12/07/2009
>
31A - CUP 2009-19 - 202 EAST FIRST STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:13:29 PM
Creation date
12/2/2009 10:41:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
12/7/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions for Approval for Conditional Use Permit No. 2009-19 <br /> <br /> Conditional Use Permit No. 2009-19 is approved subject to compliance, to the reasonable <br /> <br /> satisfaction of the Planning Manager, with all applicable sections of the Santa Ana <br /> Municipal Code, the California Administrative Code, the California Building Standards <br /> n all other a licable re ulations. <br /> Code a d pp g <br /> <br /> The applicant must comply in full with each and every condition listed below rip or to <br /> exercising the rights conferred by this conditional use permit. <br /> The applicant must remain in compliance with all conditions listed below throughout the <br /> life of the conditional use permit. Failure to comply with each and every condition may <br /> result in the revocation of the conditional use permit. <br /> A. Planning Division <br /> 1. The project shall remain in compliance with Site Plan Review (DP No. 09- <br /> 27). <br /> 2. Any amendment to this conditional use permit must be submitted to the <br /> Planning Division and Police Department for review. At that time, staff will <br /> determine if administrative relief is available or if the conditional use permit <br /> must be amended. <br /> 3. Prior to approval of a Certificate of Occupancy, all on-site improvements <br /> shall be made in accordance with the submitted plan. <br /> 4. Prior to issuance of building permits, a lighting plan including location, <br /> design details and foot-candle measurements shall be submitted to the <br /> Planning Division and Police Department for approval. <br /> 5. Hours of operation shall be limited to 7:00 a.m. to 9:00 p.m. <br /> 6. Roll-up doors shall be provided to restrict access to the carwash tunnel <br /> during non-operating hours. <br /> 7. Vacuuming equipment shall not be available or functional during non- <br /> operating hours. <br /> 8. Prior to approval of a Certificate of Occupancy, all on-site signage <br /> including directional signage shall be submitted to the Planning <br /> Department for review and approval and shall be under separate permit. <br /> EXHIBIT A <br /> Resolution No. 2009-18 <br /> Page 5 of 6 <br /> 31 A-23 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.