My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - CUP 2009-19 - 202 EAST FIRST STREET
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
12/07/2009
>
31A - CUP 2009-19 - 202 EAST FIRST STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:13:29 PM
Creation date
12/2/2009 10:41:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
12/7/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditional Use Permit No. 2009-19 <br /> October 26, 2009 <br /> Page 2 <br /> the carwash equipment and customer restrooms while the second floor will <br /> contain approximately 425 square feet of administrative office with the <br /> remaining area to be used for HVAC equipment and storage. <br /> Twenty-five parking spaces have been provided to allow vehicles entering <br /> or exiting the carwash to dry and/or vacuum their vehicles. Landscaping <br /> has been provided in excess of the City's requirements along First Street, <br /> Cypress Avenue and Walnut Street with space for decorative trellises and <br /> vine pockets along the building's eastern wall facing the alley. These <br /> vines and trellises comply with the City's recently adopted graffiti <br /> mitigation design guidelines. The Site has been designed with driveways <br /> on both First Street and Cypress Avenue to allow vehicles to circulate <br /> through the site from either driveway. These driveways will feature <br /> decorative stamped paving to further enrich the entrances to the site. <br /> The building will feature a variety of materials including burnished and <br /> precision cut block to complement the horizontal lapped siding. The <br /> second story will feature a row of six-foot windows allowing light into <br /> the carwash tunnel as well as adding height and visual interest to the <br /> building. The roof of the building will be curved metal with angular <br /> metal columns extending down to the base of the building. Arched canopies <br /> have also been provided in the parking area to complement the roof design <br /> of the building and provide a shaded area for customers to dry/vacuum <br /> their vehicles (Exhibits 3 through 6). The proposed hours of operation <br /> for the carwash will be 9:00 a.m. to 10:00 p.m., seven days a week. <br /> <br /> Analysis of the Issues <br /> The property's zoning designation allows automated car wash facilities <br /> subject to a conditional use permit per section 41-377.5(b) of the Santa <br /> Ana Municipal Code (SAMC). This conditional use permit requirement <br /> allows staff and decision makers to review projects on an individual basis <br /> to determine its compatibility with the surrounding area and apply <br /> appropriate conditions to ensure that the proposed business does not <br /> negatively affect the surrounding properties or community. <br /> As part of the analysis process for conditional use permit requests staff <br /> analyzes a variety of issues relating to proposed project in order to <br /> ensure a quality development and to provide justification for the findings <br /> needed to recommend approval. These include the extent to which the <br /> proposed project provides a needed product or service to the community; a <br /> finding that the project will not be detrimental to the health, safety or <br /> welfare of the community; that the project will not cause economic <br /> instability in the area; that the project complies will all of the <br /> 31 A-4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.