My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - WATER SYSTEM PROGRAMMING AND ENGINEERING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
02/01/2010
>
25B - WATER SYSTEM PROGRAMMING AND ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:11:46 PM
Creation date
1/27/2010 7:14:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25B
Date
2/1/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br /> COUNCIL ACTION <br /> CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: <br /> FEBRUARY 1, 2010 <br /> TITLE: APPROVED <br /> ? As Recommended <br /> AGREEMENT FOR WATER SYSTEM ? As Amended <br /> PROGRAMMING AND ENGINEERING ? Ordinance on 1S` Reading <br /> ? Ordinance on 2"d Reading <br /> ? Implementing Resolution <br /> ? Set Public Hearing For <br /> ` ~ CONTINUED TO <br /> ~~~".r.-~ FILE NUMBER _ <br /> CITY MANAGER <br /> RECOMMENDED ACTION <br /> Authorize the City Manager and Clerk of the Council to execute the <br /> attached agreement with CPC Powertec, Inc. for water system programming <br /> and engineering services in the not-to-exceed amount of $55,000 subject <br /> to nonsubstantive changes approved by the City Manager and City Attorney. <br /> DISCUSSION <br /> The City's water production facilities are controlled by a state-of-the- <br /> art Supervisory Control and Data Acquisition (SCADA) System. This system <br /> was upgraded in 2007 with new controllers at 35 facility locations. <br /> Critical facilities controlled by this system include pump stations, <br /> wells, reservoirs, and valve stations. <br /> To insure uninterrupted operation of these critical facilities, City <br /> staff must oversee the programming, repair, and replacement of system <br /> components. These major components include switchgears, motor control <br /> centers, programmable logic controllers, and main control panels. Due to <br /> the highly technical and complex nature of this work, an outside <br /> consultant is sometimes required to assist City staff with these <br /> activities. <br /> CPC Powertec, Inc. has designed and programmed many of the major control <br /> system components currently in service at City water production <br /> facilities. They have an excellent understanding of the control system <br /> logic used in the current SCADA system. They possess unique knowledge <br /> required to assist City staff in the repair, programming, and replacement <br /> of these facilities. <br /> The proposed agreement will allow staff to consult with CPC Powertech, <br /> Inc. on an as-needed basis. Due to the excellent service provided in the <br /> <br /> past and the unique knowledge they possess of Santa Ana's SCADA system, <br /> 25B-1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.