My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2010-02-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
02/01/2010
>
FULL PACKET_2010-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2016 2:54:55 PM
Creation date
1/27/2010 12:53:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
2/1/2010
Destruction Year
2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary of Key Changes in Transit Zoning Code Areas <br />Next Steps <br />C The Transit Zoning Code and the Draft Environmental Impact Report will <br />be released on February 2, 2010 <br />C Available for review at: <br />C City Website- www.santa- ana.org <br />C Main Library or the Planning Counter <br />C CD — can be purchased at the Planning Counter <br />C Comment period from February 2 to March 19, 2010. <br />C Public comment meeting scheduled for February 22, 2010 at 5:30 pm. <br />CITY COUNCIL MINUTES 12 JANUARY 19, 2010 <br />10A -12 <br />Future <br />Future Permitted <br />Allowable <br />Geographic Area <br />Existing Uses <br />Uses <br />Existing <br />Building <br />District Objectives <br />Heights <br />Min /Max <br />Provide for linkages <br />between the Civic <br />Government <br />Civic uses <br />Same as existing <br />One to 20 <br />Same as <br />Center employment <br />Center <br />stories <br />existing <br />Center employment <br />base, the SARTC and <br />the Downtown. <br />Two to 10 <br />Allow for residential <br />Commercial, <br />stories (10 <br />uses on upper floors <br />Civic, <br />Commercial, Civic, <br />One to six <br />stories only <br />of existing buildings, <br />Downtown <br />residential and <br />residential and mixed <br />stories <br />allowed in <br />ensure compatibility <br />mixed use <br />use <br />limited <br />of new buildings of <br />locations) <br />new buildings within <br />historic context. <br />Strengthen the <br />presence of <br />Residential and <br />Same as existing with <br />One to two <br />One to five <br />commercial buildings <br />First Street <br />commercial <br />addition of mixed use <br />stories <br />stories <br />and allow for new <br />economic <br />development. <br />Single -and <br />multi - family <br />residential, <br />Same as existing with <br />One to five <br />Combination of <br />neighborhood, <br />the addition of mixed- <br />stories (five <br />restoration and <br />schools, <br />use, including <br />stories only <br />sensitive infill offset <br />Lacy <br />churches <br />neighborhood- <br />One to four <br />allowed in <br />by enhanced open by <br />Neighborhood <br />, <br />schools, <br />serving retail, an <br />stories <br />limited <br />enhanced open <br />churches, <br />Industrial Overlay <br />locations <br />space to stabilize and <br />commercial, <br />Zone, and new open <br />along Santa <br />complete <br />and industrial at <br />space <br />Ana Blvd.) <br />neighborhood. <br />east end <br />One to five <br />Same as existing with <br />stories (five <br />Single- family <br />the addition of mixed- <br />(stories only <br />Logan <br />houses, <br />use, including <br />One to two <br />allowed in <br />Strengthen the <br />Neighborhood <br />neighborhood <br />neighborhood serving <br />stories <br />limited <br />residential character <br />commercial, <br />retail, and an <br />locations <br />of the neighborhood. <br />and industrial <br />Industrial Overlay <br />along <br />Zone <br />Santiago <br />Ave.) <br />Industrial, <br />Commercial/ retail, <br />Create a high <br />residential, <br />office, residential, <br />One to two <br />Three to 25 <br />intensity mixed -and <br />Rail Station <br />mixed -use, <br />mixed -use, industrial, <br />stories <br />stories <br />transit- supportive <br />commercial <br />entertainment, open <br />environment. <br />space <br />Next Steps <br />C The Transit Zoning Code and the Draft Environmental Impact Report will <br />be released on February 2, 2010 <br />C Available for review at: <br />C City Website- www.santa- ana.org <br />C Main Library or the Planning Counter <br />C CD — can be purchased at the Planning Counter <br />C Comment period from February 2 to March 19, 2010. <br />C Public comment meeting scheduled for February 22, 2010 at 5:30 pm. <br />CITY COUNCIL MINUTES 12 JANUARY 19, 2010 <br />10A -12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.