My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
METROLINK (SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY) -2003
Clerk
>
Contracts / Agreements
>
M
>
METROLINK (SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY) -2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2017 11:26:45 AM
Creation date
2/3/2010 3:05:06 PM
Metadata
Fields
Template:
Contracts
Company Name
METROLINK (SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY)
Contract #
A-2003-005
Agency
PUBLIC WORKS
Council Approval Date
1/6/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`~ • <br /> <br />• Construction of a uniform eight (8) foot concrete block wall along <br />the east side of the railroad right-of--way, which wall and its footing will <br />be entirely within the railroad right of way, from Fairhaven Avenue on the <br />north to Seventeenth Street on the south. <br />A decorative metal screen fencing with masonry wall below <br />(substantially similar to Exhibit B to this Agreement, which is <br />incorporated herein as though fully set forth) to be installed on the west <br />side of the railroad right-of--way. This would run approximately from <br />Seventeenth Street to the I-5 freeway. This would replace the existing "K- <br />rail"/chain link fence barrier currently in place in this area. <br />• An improved access pathway on the east side of the railroad right- <br />of-way to connect Fairhaven Avenue and the hiking paths along the south <br />side of Santiago Creek. This pathway would include the addition of <br />appropriate ground material (gravel, etc.) to create a defined footpath as <br />well as any required safety barrier to discourage pedestrian traffic close to <br />the railroad tracks. <br />d. Thirty (30) days following receipt of the Notice to Proceed from <br />the CITY and award of major construction contract by SCRRA for the Project, SCRRA <br />shall pay CITY One Hundred Ninety Thousand Dollars ($190,000.00) for the CITY <br />Enhancements. The City shall design construct, and maintain (to the extent they are <br />located on the City's property) the CITY Enhancements in full compliance with all <br />Measure M requirements, which shall include but not be limited to the following list. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.