Laserfiche WebLink
r <br />SCOPE OF WORK <br />CONTRACTOR SHALL CAREFULLY DEMOLISH AND REMOVE: <br />• Two metal kiosks (approximately 400 SF each) <br />• Two metal kiosks (approximately 600 SF each) <br />• Large metal canopy (approximately 800 SF) <br />• All square metal posts and glue-lam beams supporting the main canopy and the canopies above the kiosks. <br />• All other improvements on the site excludin the paving (flatwork). <br />NOTE: <br />The metal posts supporting the main canopy and canopies above the kiosks shall be cut-off flush with the floor so <br />that they do not create a trip hazard. All metal shall be recycled. <br />The paving shall be preserved and protected from damage during the course of the work. <br />All electrical to the kiosks shall be removed and properly capped. <br />CONTRACTOR MUST SIGN AND DATE THE SPECIFICATIONS AND INCLUDE THEM IN THEIR BID. <br />BIDS THAT DO NOT CONTAIN THE SIGNED SPECS WILL BE CONSIDERED NONRESPONSIVE AND REJECTED. <br />Contractor's Name <br />C~ ~~~ <br />Contractor's Signat <br />~~-O~_ /0 <br />Date <br />