My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRIME DEMOLITION, INC. 1
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
P (INACTIVE)
>
PRIME DEMOLITION, INC. 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2013 11:29:29 AM
Creation date
2/8/2010 1:17:39 PM
Metadata
Fields
Template:
Contracts
Company Name
PRIME DEMOLITION, INC.
Contract #
N-2010-005
Agency
COMMUNITY DEVELOPMENT
Expiration Date
6/30/2010
Insurance Exp Date
3/5/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. rlvst~~a~~cE orl FILE N-2010-005 <br />WORK N#AY PROCEED <br />U~ITiL 1NSURAfVCE EXPIRES <br />3-~-~0 <br />CLERK OF C0~ CIJ„~B .~ $ Q~' <br />DATES 1~~ tt <br />O : Cpf4 C DEMOLITION CONTRACT <br />GGby <br />LoY~e~~ THIS CONTRACT, made and entered into this ~~day of January, 2010, by and between Prime <br />Demolition, Inc., a California Corporation, hereinafter referred to as "Contractor", and the City of Santa <br />Ana, a charter city and municipal corporation, hereinafter referred to as "City". <br />RECITALS: <br />A. City desires to employ a general licensed building Contractor as defined in California <br />Business and Professions Code § 7057 to perform demolition work on property located at 325 E. Fourth <br />Street, in the City of Santa Ana (the "Property"). <br />B. Contractor represents that it is qualified to perform such work as desired by City. <br />WHEREFORE, for and in consideration of the respective and mutual covenants and promises <br />hereinafter contained and made, and subject to all the terms and conditions hereof, the parties hereto agree <br />as follows: <br />1. SCOPE OF WORK <br />A. Project Specifications. Contractor agrees, at its sole cost and expense, to provide all supervision, <br />technical personnel, labor, materials, machinery, tools, equipment, fixtures and services for the work <br />required for demolition of the Property, in accordance with the attached bid and proposal, general <br />conditions, work write-ups, specifications, and drawings, which documents are incorporated herein by <br />reference as though fully set forth. (See Exhibit A "Project Specifications" attached hereto and incorporated <br />herein by reference). <br />Contractor shall perform all work. in conformance with applicable laws and local requirements <br />whether or not covered by the specifications and drawings for the work. <br />Contractor shall pay all sales, consumer, use and other similar taxes required by law, and shall <br />procure and pay for all permits and licenses necessary for the execution and completion of the work and <br />labor to he performed hereunder. <br />B. Prevailing wage. All laborers and mechanics employed by the Contractor and any subcontractor <br />in the performance of the work under this Agreement shall be paid wages at rates not less than the <br />prevailing wage as provided in the statutes applicable to public works including without limitation <br />Sections 1770-1780 of the California Labor Code. This paragraph does not apply to contracts which <br />do not exceed $2,000. <br />2. NOTICE TO PROCEED/NOTICES <br />The work shall begin no later than twenty (20) calendar days from and after Contractor receives <br />written notice to proceed from the City. Failure by Contractor without lawful excuse to substantially begin <br />work within twenty (20) days of the date of receipt of said written notice to proceed shall postpone the next <br />succeeding payment to the Contractor for that period of time equivalent to the time between when work was <br />to begin and when it did begin. City shall give said notice to proceed within forty-five (45) calendar days <br />from and after the date of the signing of this Contract. If the written notice to proceed is not received by <br />Contractor within said period, Contractor reserves the right to withdraw his bid and proposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.