My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - LANDSCAPE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
02/16/2010
>
25C - LANDSCAPE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:11:30 PM
Creation date
2/9/2010 8:45:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
2/16/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
quality using a combination of cleansers, metal polish product, hand andlor <br /> power tools. Should the drinking fountain be so plugged that dismantling the <br /> fountain is required the Contractor shall notify the Director immediately so City <br /> staff can make the repair. <br /> 10. PlaygroundlTot-Lot Areas <br /> a} The Contractor shall provide maintenance of ail playgrounditot-lot sand and <br /> rubberized areas once a week. Maintenance shall include, but not limited to, <br /> loosening of compacted areas, re-grading sand areas to level condition <br /> (eliminating ruts, depressions, build up areas, etc.), sifting of sand to assure that <br /> debris and any other foreign objects are removed, removal of weeds, removing <br /> sand on sidewalks surrounding the playground/tot-lot, eliminating berms <br /> (including pre-existing) in the turf surrounding the playgroundJtot-lots (high <br /> pressure water blasting or sod cutting, leveling and re-sodding are approved <br /> methods), and trash and other undesirable material. Rubberized fall areas shall <br /> be cleaned of sand and debris daily. Any sand that accumulates on the <br /> rubberized surface shall be reused. Sand and debris on the playground <br /> equipment shall be removed. <br /> b} The City shall be responsible for all playground equipment and tot-lot area <br /> safety inspections. <br /> <br /> 11. Ball Diamond Maintenance <br /> The Contractor shall retain asub-contractor to provide ball diamond infield <br /> maintenance as set forth in Attachment 1. IT IS THE INTENT OF THIS <br /> AGREEMENT THAT THESE FACILITIES BE MAINTAINED SO THAT <br /> PLAYER SAFETY AND THE QUALITY OF PLAY ARE CONTINUOUSLY <br /> ENHANCED. <br /> a} Baseball Perimeter Maintenance <br /> Ball diamond perimeter maintenance shall be performed daily. Ball diamond <br /> perimeter maintenance shall be defined as all areas outside the field of play and <br /> sideline/dugout areas where coaches, players and others associated with the <br /> game gather. Ball diamond perimeter maintenance areas shall inchide but is not <br /> limited to grandstands, areas around concession stands, fence lines, warm-up <br /> areas, etc. The work that shall be performed on a daily basis shall include <br /> picking up trash and debris, blowing off areas/hosing down areas using a high <br /> pressure nozzle to remove brick dust, stains and/oi any ather foreign material, <br /> such as sunflower seeds or peanut shells, so that all areas, including pavement <br /> and landscape areas, are 100% free and clean. <br /> b) Daily Outfield Maintenance <br /> (1) Irrigation checks and repairs to assure that irrigation heads are at the <br /> proper grade to avoid injury to players who may fall on them and that no <br /> "slippery" areas exist. <br /> 25C-106 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.