My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - LANDSCAPE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
02/16/2010
>
25C - LANDSCAPE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:11:30 PM
Creation date
2/9/2010 8:45:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
2/16/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12.4.2 Any broadleaf weeds shall be eradicated immediately upon notice. The <br /> Contractor may choose the method of eradication, however, may not <br /> damage the turf. <br /> 12.5 Infield turf shall be kept free of disease and rodents at all times. <br /> 12.5.1 The Contractor shall be responsible for identifying and treating any <br /> diseases or rodents immediately upon notice. <br /> 12.b Infield turf annual renovation <br /> 12.7 Each year the infield turf shall be renovated: 1) verticut using the greens reel mowers <br /> straight blade reels; 2) mowed to %a" high immediately following verticutting; 3) <br /> overseeded during spring/summer with LaPrima XD Bermuda Seed at a rate of 8 <br /> pounds of seed per 1,000 square feet and fall/winter -Stover Seed Company Grand <br /> Slam seed at eight (8) pounds per 1,000 square feet; and, 4} top dressed immediately <br /> following seeding by Aguinaga Materials using "Santa Ana Top Dress Mix." <br /> 12.8 All infield turf edges including the arc skin line, base paths, pitchers mounds, etc., shall <br /> be edged one (1) time per week. The edged lines shall be straight and, where curved <br /> lines are required, the arcs will be a true radius. <br /> <br /> 13.0 General Contract Provisions <br /> 13.1 Contractor shall provide and is responsible for all equipment necessary to carry out <br /> the work outlined in the contract. There will be no available storage for equipment. <br /> Contractor will be responsible for bringing in and then removing all equipment <br /> necessary to carry out the work outlined in the contract. <br /> 25C-119 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.