Laserfiche WebLink
<br /> 11. Ball Diamond Maintenance <br /> The Contractor shall retain asub-contractor to provide ball diamond infield <br /> maintenance as set forth in Attachment 1. IT IS THE INTENT OF THIS <br /> AGREEMENT THAT THESE FACILITIES BE MAINTAINED SO THAT <br /> PLAYER SAFETY AND THE QUALITY OF PLAY ARE CONTINUOUSLY <br /> ENHANCED. <br /> a) Baseball Perimeter Maintenance <br /> Ball diamond perimeter maintenance shall be performed daily. Ball diamond <br /> perimeter maintenance shall be defined as all areas outside the field of play and <br /> sideline/dugout areas where coaches, players and others associated with the <br /> game gather. Ball diamond perimeter maintenance areas shall include but is not <br /> limited to grandstands, areas around concession stands, fence lines, warm-up <br /> areas, etc. The work that shall be performed on a daily basis shall include <br /> picking up trash and debris, blowing off areas/hosing down areas using a high <br /> pressure nozzle to remove brick dust, stains and/or any other foreign material, <br /> such as sunflower seeds or peanut shells, so that all areas, including pavement <br /> and landscape areas, are 100% free and clean. i <br /> b) Daily Outfield Maintenance <br /> {1) Irrigation checks and repairs to assure that irrigation heads are at the <br /> proper grade to avoid injury to players who may fall on them and that no <br /> "slippery" areas exist. <br /> (2} Fill in of divots and depressions and all uneven areas with #20 white silica <br /> sand, organic compost mixed with LaPrima XD Bermuda grass seed <br /> during the spring/summer and Stover Grand Slam perennial rye grass seed <br /> during the fall winter to re-establish the areas. <br /> {3} Level fence line areas using a rock or leveling rake. <br /> {4) Level and drag warning track areas using nail drag followed by finishing <br /> drag mats. Contractor shall apply new brick dust to fence lines and <br /> warning tracks as necessary to maintain consistent %2" layer of brick dust <br /> in these areas. <br /> c) Weekly Maintenance <br /> (1) Contractor will then edge the fence lines and warning track to achieve <br /> crisp straight lines and a smooth crisp arc where the brickdust warning <br /> track meets the sport turf. <br /> d} Annual Maintenance <br /> 25C-32 <br /> <br />