Laserfiche WebLink
8.1.3 Apply Dry Gail Materials "Pro Gold with Stabilizer" Brickdust Materials <br /> from stock to all Wet Areas and Rake Out. <br /> <br /> 9.0 Work to be Completed "BI-MONTHLY" <br /> 9.1 To maintain levelness of all fields, contractor shall, once every two months, scarify drag <br /> built up amounts of materials at high spots and cut and level drag the scarified material <br /> to low spots. The Contractor shall fill any remaining low spots with new Gail Materials <br /> "Pro Goid with Stabilizer" Brickdust from stock and make level. <br /> Note: Staff shall identify areas to scarify/cut and level drag to <br /> the contractor at weekly meetings with contractors <br /> appointed site supervisor {as per section 6.2 of contract). <br /> 9.2 Heavy water scarified and cut and leveled areas to a min. depth and allow settling in <br /> before play on field. <br /> Note: Due to heavy watering and its need to settle before play, <br /> staff shall provide a schedule of bi-monthly scarify/cut <br /> and level drag dates to contractor. <br /> 10.0 Work to be Completed "ANNUALLY" <br /> 10.1 Each year, the following renovation is to be done on all fields in conjunction with the <br /> City's Annual Sports Turf Renovation Schedule. Fields renovated may change from <br /> year to year. <br /> 10.1.1 Contractor shall laser grade each ball diamond. Contractor shall scarify <br /> drag built up amounts of materials at high spots and cut and level drag <br /> the scarified material to Iow spots. The Contractor shall fill any <br /> remaining low spots with new Gail Materials "Pro Gold with Stabilizer" <br /> Brickdust from stack and make level. <br /> Note: Staff shall identify areas to scarify/cut and level drag at <br /> the November meeting with contractor's owner (as per <br /> section 6.3 of contract). <br /> 10.1.2 Contractor shall verify all base distances, pitching rubber distances and <br /> pitching mound heights per the Little League, Pony/Colt League <br /> specifications for each specific field. Contractor shall repair any <br /> specifications not being met on any field. <br /> 10.1.3 In addition, contractor shall install 1l2" new Gail Materials "Pro-gold <br /> with Stabilizer" (Brickdust) to in-fields at alI diamonds (minimum 2b <br /> tons per Girls SoftbalUMajor Little League Field and minimum 40 tons <br /> per Junior/Senior Little League Field). Also, the contractor shall install a <br /> minimum of 1 ton of Turface calcite clay per Girls SoftbalUMajor Little <br /> League Field and 2 tons of Turface calcite clay to Junior/Senior Little <br /> 25C-43 <br /> <br />