Laserfiche WebLink
ATTACHMENT 6 <br /> Plant Cap <br /> Ground <br /> Cover <br /> 2" Shrubs, 64 Ct Vines, <br /> <br /> Site Plugs 1 Gai Flt 1 Gal <br /> Cesar <br /> 1 Chavez/Campesino 100 50 0 200 <br /> 2 Riverview Park 200 7.00 25 200 <br /> 3 Rosita Park 1,000 200 0 200 <br /> 4 Edna Park 1,000 50 0 200 <br /> 5 EI Salvador Park 200 200 0 100 <br /> Subtotal District 1 2,500 600 25 900 <br /> Note: This plant cap is an annual plant cap for each district. Plants that die <br /> as a result of Contractor's negligence are not applied to this plant cap. Where <br /> Contractor can show that vandalism was the cause of the plants death, City will <br /> assume cost of replacing (excludes vines}. City can elect to install plants in <br /> existing bare areas, or new construction areas. <br /> <br /> Standard Plant <br /> Casts <br /> 64 Ct. <br /> 5 gal $8.84 Flat $9.95 <br /> 1 gal $2.95 Plugs $0.40 <br /> Plants costing more than standard plants shall be considered premium. City will <br /> pay only the incremental difference between a standard plant and the premium <br /> plant. <br /> 25C-63 <br /> <br />