My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - LANDSCAPE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
02/16/2010
>
25C - LANDSCAPE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:11:30 PM
Creation date
2/9/2010 8:45:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
2/16/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a). Repairs to landscaping, sprinkler systems, and/or facilities, unless damaged <br /> by Contractor. <br /> 2.04 PROTECTION OF EXISTING FACILITIES AND STRUCTURES <br /> The Contractor shall exercise due care in protecting from damage all existing facilities, <br /> structures, and utilities, both above surface and underground on the City's property. Any <br /> damage to City, SAPRF, or pz•ivate property caused by the Contractoz s neglect shall be <br /> corrected and paid for by the Contractor at no cost to the City of Santa Ana or SAPRF. The <br /> City of Santa Ana and/or SAPRF shall make the determination of fault. ~ The SAPRF <br /> representative reserves the right to issue a Stop Work Notice if the Contractor does not <br /> promptly repair any damage, within twenty-four (24} hours of the damage incurred. <br /> If the SAPRF representative requests or directs the Contractor to perform work in a given area, <br /> it will be the Contractor's responsibility to verify and locate any underground systems (i.e. <br /> utilit3' lines} and take responsibility for taking reasonable precaution when working in these <br /> areas. <br /> Contractor shall call Underground Alert (800) 422-4133} at least two working days prior to <br /> digging for line locations. Any damage or problems shall be reported immediately to the <br /> SAPRF representative and the City of Santa Ana. If the Contractor discovers something <br /> unexpected or a unique problem occurs, he should stop work and immediately contact an <br /> authorized SAPRF representative for a timely resolution of the problem. <br /> 2.05 CONTRACTOR'S STAFF <br /> The Contractor shall provide sufficient personnel to perform all work in accordance with the <br /> specifications set forth herein. A qualified, English speaking supervisor in the employ of the <br /> Contractor shall supervise all of the Conhactor's personnel. The supervisor shall be available <br /> at all times to the SAPRF representative during work operations. The responsibility for all <br /> work performed will remain with the full-time certified arborist. <br /> The Contractor shall furnish the necessary competent and key personnel to properly supervise <br /> and dizect the work of fully equipped, competent and experienced crews as well as all safety <br /> equipment, including but not limited to, all equipment and work procedures required by ANSI <br /> 2133.1-1994. The Contractor shall secure all timekeeping, bookkeeping and other necessary <br /> clerical and office work required in the performance of the contract. <br /> The Contractor shall be responsible for the supervision of all of his crews. He shall check all of <br /> his crews regularly for proper quantity and quality of work, proper maintenance of tools and <br /> equipment, and safety. <br /> 2.06 SUBSTITUTIONS <br /> Whenever a specific type of material is specified, no substitutions shall be allowed without <br /> written consent of the SAPRF representative. <br /> <br /> 2.07 CERTIFICATION OF MATERIALS <br /> All materials shall be delivered on the site in original containers. Materials shall be subject to <br /> inspection by the ARMD representative. The SAPRF representative will not approve materials <br /> 25C-74 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.