My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - LANDSCAPE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
02/16/2010
>
25C - LANDSCAPE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:11:30 PM
Creation date
2/9/2010 8:45:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
2/16/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mower for the larger open turf areas, a 52" mower and a small walk <br /> behind mower for areas between trees and othet• park amenities. The <br /> Director shall determine height of cut. String trimmers are not allowed <br /> for mowing turf. Any visible clippings shall be collected and disposed <br /> of pursuant to SAMC Chapter 16. <br /> (1) All "sport/priority" turf as described in Attachment No. 2 shall be <br /> mowed once a week all year. Any visible clippings shall be collected <br /> and disposed of pursuant to SAMC Chapter 16. The Contractor shall <br /> mow the sport/priority turf areas at '/a" to 1" using a power driven <br /> fairway reel mower and a walk behind reel mower along skinned infield <br /> brick dust areas, turf infields, turf infield foul areas, soccer/football <br /> fields, soccer/football out of bound areas. The Director's Representative <br /> shall direct the Contractor to mow the sport/priority turf lower than 3/a" <br /> to 1" if necessary. Note that the ball diamond infield maintenance sub- <br /> contractor shall be responsible for mowing turf infields and other <br /> designated ball diamond turf areas. (see Attachment 1). <br /> {2) The Contractor shall maintain mowers that provide a smooth, even cut <br /> without ridges or depressions and without tearing of the leaf blades <br /> (caused by unsharpened mower blades). Mowing shall be performed at <br /> the speed the mowers manufacturer specifies to maximize quality of cut. <br /> Mowing shall be performed with straight and flowing patterns approved <br /> by the Director's Representative. The emphasis will be on quality <br /> mowing vs. speed and unprofessional patterns. From time to time the <br /> Director will direct the Contractor to change mowing pattern to <br /> minimize rutting and compaction. The Contractor shall mow grasses <br /> and broadleaf plants once per month in the Santiago Park Day Camp <br /> (Nature Reserve) meadow area. <br /> <br /> b) Edging and Detailing <br /> All edging shall be performed with the use of a McClain's edger or approved <br /> substitute. Stick edgers are not allowed. Contractor shall edge all turf adjacent <br /> to all improved hard surfaces such as concrete, decomposed granite, asphalted <br /> concrete paved at•eas. Edging/detailing shall be performed at the same time <br /> mowing occurs. Chemical detailing of turf may occur with the Director's <br /> approval. If chemical detailing is performed, the Contractor shall use the string <br /> trimmer to remove the treated turf within one (1) week after symptoms of <br /> phytotoxicity become recognizable. <br /> (1) The Contractor shall use the McCIain's edger to edge straight lines along <br /> fences, walls, or long flowing arcs. The Ditector's Representative may <br /> require the Contractor to use string lines to edge straight lines if the <br /> Contractor's staff fails to achieve this quality without this method. <br /> (2} The Contractor shall detail around trees, along walls/fences and other <br /> park amenities first using a sharpened shovel cut to establish a concentric <br /> round circle around trees, poles, etc. Once the initial detailed circle is <br /> established a skiing trimmer may be used to maintain the circle. Should <br /> the circle begin to deform the Director shall direct the Contractor to <br /> repeat the detail process. <br /> 25C-95 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.