<br /> TETRA TECH <br /> Exhibit "A" <br /> San Lorenzo Sewage Lift Station -Additional Services Request <br /> Page 2 <br /> Task No. 4: Estimate Truck/Equipment For Various Stages of Construction. Tetra Tech will <br /> provide estimate of the number and types of vehicles/equipment required far the various stages of <br /> construction. We are requesting a budget of $1,400 for this additional service. <br /> Task No. S: Respond to Request for Additional Information. Tetra Tech will provide additional <br /> information as requested on construction methods, odor control system, etc. This is in addition to the <br /> normal question/answers included in Task No. 1. We are requesting a budget of $3,800 for this <br /> additional service. <br /> Task No. 6: Update Electrical Plans and Resubmit for Electrical Permit. Tetra Tech will update the <br /> electrical plans to incorporate any code changes and resubmit for electrical permit. The electrical plans <br /> were completed based on California Code 2007. The comments from the first electrical plan check <br /> comments were already taken care of. Therefore, the level of effort to perform the updates should be <br /> minimal. We are assuming the major change that may be required will be performing the Title 24 <br /> energy calculations. We are requesting a budget of $6,200 for this additional service. <br /> Task No. 7: Incorporate Mitigation Measures into Plans and Specifications. Tetra Tech will revise <br /> the project plans, specifications and cost estimate to incorporate any additional mitigation measures <br /> identified in the final EIR. We are requesting a budget of $1,500 for this additional service. <br /> Task No. 8: Preliminary Layout and Cost to 1~tove Building. Tetra Tech was requested to prepare a <br /> preliminary layout and construction cost estimate to move the building out of the existing adjacent <br /> property. This work was performed to assist the City in the acquisition of the proposed easement. We <br /> are requesting our budget be increased by $4,000 to compensate us for this additional work. <br /> Task No. 9: Update Specifications due to Delay. The EIR process will be delaying the completion of <br /> the plans and specifications until at least January 2011. This is a two year delay from the date of the <br /> previously signed plans and specifications. Tetra Tech will need to confirm the manufacturer) <br /> equipment specifications to make sure the equipment model/type specified is still available and <br /> appropriate. We are requesting a budget of $2,000 for this additional service. <br /> Task No. t0: Delay in Construction Phase Support. The original proposal assumed construction <br /> would be completed by June 2007. Our July l7`'', 2007 approved extra increased our budget for <br /> construction phase support assuming would be completed by December 2009. Based on the estimated <br /> schedule of completing the EIR by early 201 I, we are estimating that construction of the project will <br /> not be completed until end of 2012. <br /> This additional three year delay will impact the assumed cost to perform the construction support <br /> services. Our current approved Construction Phase Support budget is $47,400 (original proposal <br /> amount of $43,100 and additional $4,300 per July l7`h. 2007 approved extra). We are requesting a 12% <br /> increase in the construction phase support to compensate Tetra Tech for this three year delay, or an <br /> increase of $5,600. With this increase, our Construction Phase Support Budget will be $53.000. <br /> 25A-9 <br /> <br />