Laserfiche WebLink
it <br /> Vehicular access to the campus is provided via one inbound-only driveway on Berendo Avenue <br /> (West of New Hampshire Avenue), one two-way driveway on Redondo Beach Boulevard with <br /> right-in/right-out only access, and one two-way driveway on New Hampshire Avenue. <br /> Parking was observed during typical operation on a weekday when class was in session. At the <br /> time of observation, midday, parking utilization was heavy. Parking spaces were mostly <br /> unavailable on the surface lots as well as the parking structure. <br /> Reseda Campus <br /> The Reseda Everest College campus is located in the Kaiser Hospital building and consists of <br /> 16,351 square feet of office space and 15,094 square feet of instruction floor area. The campus is <br /> located on the southeast corner of the intersection of Sherman Way and Lindley Avenue in the <br /> City of Reseda, California. There are 852 students and 76 staff members at this site. The campus <br /> operates from 6:00 AM to 10:45 PM Monday through Thursday, and from 6:00 AM to 6:00 PM <br /> on Friday. The campus is closed on the weekends. <br /> The parking for the campus consists of a surface parking lot located behind the building. A total <br /> of 129 parking spaces are reserved for Everest College. Vehicular access to the campus is <br /> provided via two two-way driveways on Lindley Avenue, and one outbound only driveway on <br /> Sherman Way. <br /> Parking was observed during typical operation on a weekday when class was in session. The 129 <br /> parking spaces are not enough to meet the needs of the facility. At the time of observation, <br /> during the midday session, no Everest Reserved parking stalls were available; vehicles were <br /> observed double-parked while they waited for parking, and other vehicles circled the parking lot <br /> searching for an empty Everest Reserved stall. Some Everest vehicles were observed using <br /> Kaiser reserved parking stalls on various occasions. <br /> Operating and site information for each campus is summarized on Table 5. Review of the <br /> operating and site information summarized in Table 5 reveals the following comparisons and <br /> observations for the proposed Santa Ana campus: <br /> • Of the four sites, the Alhambra campus and Anaheim campus most closely resemble the <br /> proposed Santa Ana campus, based on the single occupancy of the building. <br /> • The Anaheim campus has a population of 871 students and 64 staff members, which is <br /> closest to the estimated population for the proposed Santa Ana campus. <br /> • All four sites had a roughly equal proportional mix of classroom to office space, whereas <br /> at the Santa Ana site, the mix is proposed to be roughly 1/3 classroom and 2/3 office <br /> space. <br /> I <br /> <br /> Corinthian College - 11 - February, 2010 <br /> <br /> Parking Study <br /> 31 A-31 <br /> <br />