My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2010-04-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
04/05/2010
>
FULL PACKET_2010-04-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2018 11:09:59 AM
Creation date
4/7/2010 3:55:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/5/2010
Destruction Year
2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARKING STUDY <br />FOR <br />CORINTHIAN COLLEGE <br />IN THE CITY OF SANTA ANA <br />INTRODUCTION <br />This report has been prepared to evaluate the parking requirements, queuing, and site circulation <br />for the proposed Corinthian College. The proposed Corinthian College will occupy an existing <br />39,516- square -foot office building, located at 500 West Santa Ana Boulevard in the Civic Center <br />area in the City of Santa Ana. A 258 -space parking structure is also located on the site, adjacent <br />to and south of the building. The facility will become part of the Everest College campuses. <br />The current parking supply will not provide enough parking to meet the City of Santa Ana <br />Parking Code requirements. This study has been prepared to determine whether or not the <br />parking supply will be adequate to meet the needs of the proposed Corinthian College operation. <br />The applicant is pursuing the opportunity to use additional parking, if needed, at three off -site <br />locations in the Civic Center area. Queuing at the entrance to the parking structure, and site <br />circulation for vehicles and pedestrians will also be evaluated. <br />PROJECT DESCRIPTION <br />Existing Project Site <br />The project site is located on the west side of Ross Street, between Santa Ana Boulevard and and <br />Street. The site is a vacant office building totaling 39,516 square feet, with an adjacent parking <br />structure. A site plan depicting the existing site is presented on Figure 1. <br />The adjacent four -level parking structure provides 258 parking stalls. The parking structure is <br />accessed from 3rd Street. Currently, the on -site parking structure is used as paid public parking <br />for the adjoining building (the proposed Corinthian College) and the surrounding buildings in the <br />Civic Center area. The cost to park is $1.50 for up to one hour, $6 for all day, and $45 for a <br />monthly pass. The parking structure is monitored by an attendant. The attendant collects the <br />money from each driver on the way into the structure based on the amount of time the driver <br />intends to park, gives the driver a time - stamped ticket, and theft checks the ticket on the way out <br />to ensure the proper amount was paid. Pedestrian access from the parking structure to the <br />building is provided in a number of locations. <br />Corinthian College - 1 - February, 2010 <br />Parking Study <br />31A-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.