Laserfiche WebLink
¦ <br /> erome enter enovatlon <br /> <br /> • Total Budget: 3,464,843 <br /> o Design: $ 297,543 <br /> o Construction: $3,167,300 <br /> <br /> • Fundin Sources: <br /> g <br /> o State Urban Parks Grant $2,500,000 (expiration 30 June 2010) <br /> o PRCSA (Main/facilities fund) $ 95,000 <br /> o CDBG $ 500,000 <br /> o CDBG $ 269,843 <br /> o County Grant $ 100,000 <br /> <br /> • General Contractor: Lehman Construction, Inc. <br /> <br /> • Construction period: November 2008 -April 2010 <br /> <br /> • Project includes: <br /> • In-Concept: <br /> o Address deteriorated facilities <br /> o Bring building "up to current codes" <br /> o Address heating, ventilation and air conditioning issues <br /> o Address inadequate lighting <br /> o Address noise issues <br /> • Specifically: <br /> o Upgrade of the HVACsystem cheating,ventilation and airconditioningsystem)throughout, <br /> o Upgrade and expansion of the electrical and lighting systems throughout, <br /> o New gymnasium floor, new backstops, new scoreboards and clocks <br /> o Restroom/shower room renovation &expansion <br /> o New frontentrance, which includes relocation of main buildingentrancefrom Monte Vista Ave. <br /> to Center St. <br /> o New front lobby/recepfion and open office area <br /> o New roof <br /> o Kitchen renovation knew cabinets, painting, ventilation, etc.) <br /> o Exterior/interior painting, <br /> o New flooring throughout, <br /> o Door and window replacement throughout, <br /> o New ceiling throughout <br /> o New playground <br /> o Pool building improvements <br /> o Parking lot resurfacing <br /> o New security cameras, system. <br /> <br />