My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECONOLITE TRAFFIC ENGINEERING AND MAINTENANCE, INC. (AEGIS, ITS) (2)-2009
Clerk
>
Contracts / Agreements
>
E
>
ECONOLITE TRAFFIC ENGINEERING AND MAINTENANCE, INC. (AEGIS, ITS) (2)-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2012 6:00:56 PM
Creation date
4/20/2010 11:19:55 AM
Metadata
Fields
Template:
Contracts
Company Name
ECONOLITE TRAFFIC ENGINEERING AND MAINTENANCE, INC. (AEGIS, ITS)
Contract #
A-2009-124-001
Agency
PUBLIC WORKS
Expiration Date
8/31/2012
Insurance Exp Date
4/27/2013
Destruction Year
2017
Notes
EFFECTIVE 1/1/2012 ECONOLITE MERGED INTO AEGIS, ITS-SEE A-2009-124 FOR ASSIGNMENT OF CONTRACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum No. I July 9, 2009 <br />50. Vacuum Truck $ N /job trip <br />IV. Cellular Phone / Radio Equipment <br />The Contractor shall provide four (4) cellular phone for City staff's use during this <br />contract (two for traffic signal maintenance and two for street light maintenance) to <br />facilitate communication with the Contractor at the Contractor's cost. <br />V. Bid Scenario - Street Li ht <br />For comparison purposes please bid the repair scenario utilizing the previous bid <br />prices. <br />The City of Santa Ana has experienced a street lighting outage in a neighborhood with <br />series high voltage street lighting. The outage encompasses several streets in the <br />neighborhood affecting 24 cast iron double king street lights with 2500 lumen lamps. A <br />night drive was required to identify the scope of the outage. The lighting repairs required <br />three (3) working days to complete the repairs. After completion of USA markings, the <br />following personnel, equipment and materials were dispatched to repair the lighting. <br />1. Two service personnel: Lead High Voltage Street Light Technician and a Service <br />Laborer for three days. <br />Cost: 3, ,;?qo <br />2. Night Drive: <br />Cost: 0 <br />3. Equipment: Service truck with a compressor for three days. <br />Cost:. a3 <br />4. Materials Used: <br />300 If of# 8 neoprene high voltage wiring <br />2 ea. #5 pull boxes, <br />3 ea. #3 pull boxes <br />19 ea. compression fittings <br />15 ea. bags of rock <br />6 ea. 250066G, 2500 lumen lamps <br />6 ea. Cut out disks <br />Supplier Cost: 1 <br />Markup: -7, a 3 <br />Total Material Cost: 5Q6). 1 ?>- <br />Total Cost (item 1-4): S_ L4 , a Gj5 r l c? <br />Page 4of16
The URL can be used to link to this page
Your browser does not support the video tag.