Laserfiche WebLink
P L A N N I N G <br />PROPOSAL TO PROVIDE AN EIR, TECHNICAL STUDIES, AND RELATED PROCESSING <br />SERVICES FOR THE SAN LORENZO LIFT STATION PROJECT <br />January 29, 2010 (Revised) <br />Thank you for your time and careful consideration of this proposal. We would be willing to modify our <br />proposed scope of work, should the City require our role on any of the identified tasks to be expanded or <br />reduced. If you should need any additional information about our firm, or if you would like to meet with us <br />in person to discuss the enclosed Scope of Work or Budget, please do not hesitate to contact me directly at <br />(714) 505 -6360 extension 105, or via email at jmorse() ftlanning com. <br />Sincerely, <br />T &B Planning, Inc. <br />Joel Morse <br />Vice President <br />www.tbplanning.com <br />PLANNING I DESIGN I ENVIRONMENTAL I GRAPHICS <br />