My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
OTIS ELEVATOR COMPANY 4
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
OTIS ELEVATOR COMPANY 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:47:58 PM
Creation date
4/22/2010 11:34:24 AM
Metadata
Fields
Template:
Contracts
Company Name
OTIS ELEVATOR COMPANY
Contract #
A-2009-197
Agency
POLICE
Council Approval Date
12/7/2009
Expiration Date
12/31/2011
Insurance Exp Date
4/1/2012
Destruction Year
2018
Notes
Amended by A-2009-197-01, -02
Document Relationships
OTIS ELEVATOR COMPANY 4A
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
OTIS ELEVATOR COMPANY 4B
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specifications for the <br />Police Administration Building <br />& Holding Facility <br />Car and Counterweight Buffers <br />- Overspeed Governors, Governor Tension Sheave Assemblies, and Car and <br />Counterweight Safeties <br />- Limit, Landing and Slowing Switches <br />- Door Protective Devices and Alarm Bells <br />Conduct a yearly no-load, low speed test of car and counterweight safeties and a test of <br />buffers. <br />Periodically equalize the tension in all hoistway ropes. Replace all wire ropes and <br />fastenings, when conditions warrant. <br />Examine and when conditions warrant, regroove or replace all sheaves, governor tension <br />sheaves, secondary or deflection sheaves, and compensationg sheaves. <br />Periodically examine, lubricate, adjust, and when conditions warrant through normal <br />wear and tear, repair or replace the following accessory equipment. <br />Car and Corridor Operating Push -buttons <br />Load Weighing Equipment <br />All Hall Lantherns, Car Position, and Hall Position indicators, Lobby Control <br />Panels, Car Operation Panels, and all other Signal and Accessory Facilities <br />furnished and installed as part of the whole equipment. <br />Periodically clean all elevator machine rooms, secondary areas, elevator hoistways, and <br />pit areas. Montgomery KONE Inc. will be responsible for keeping the machine rooms, <br />the exterior of the machinery, and any other parts of the equipment subject to rust, <br />properly painted, identified, and presented to all times. During the course of each <br />examination, all accumulated refuse in the pit areas will be discarded. <br />Annual clean the elevator hoistway and related equipment including rails, inductors, <br />hoistway door hangers and tracks relating devices, switches, buffers, car tops and pit <br />areas. <br />Exhibit A <br />Page 3 <br />Steel Parts cabinets will be maintained in the machine room areas to provide for the <br />orderly storage of replacement components. <br />Perform the following tests on the elevator equipment: <br />20 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.