Laserfiche WebLink
LI ON <br /> BUILDING AMCRICA' 1,01 <br /> • Install 12-inch LED flashing signal heads to replace existing 8-inch light units; <br /> • Engineering, and <br /> • Flagging. <br /> SECTION 3. <br /> A. The work to be performed by the Railroad, at the City's sole cost and expense,is described in <br /> the Railroad's Signal Material Estimate dated May 10, 2009, in the amount of$60,333.00, <br /> marked Exhibit C, attached hereto and hereby made a part hereof(the "Estimate"). <br /> B. The Railroad, if it so elects,may recalculate and update the Estimate submitted to the City in <br /> the event the City does not commence construction on the portion of the Project located on <br /> the Railroad's property within six (6) months from the date of the Estimate. <br /> C. The City acknowledges that the Estimate does not include any estimate of flagging or other <br /> protective service costs that are to be paid by the City or the Contractor in connection with <br /> flagging or other protective services provided by the Railroad in connection with the Project. <br /> All of such costs incurred by the Railroad are to be paid by the City or the Contractor as <br /> determined by the Railroad and the City. If it is determined that the Railroad will be billing <br /> the Contractor directly for such costs, the City agrees that it will pay the Railroad for any <br /> flagging costs that have not been paid by any Contractor within thirty (30) days of the <br /> Contractor's receipt of billing. <br /> D. The City agrees to reimburse the Railroad for one hundred percent(100%) of all actual costs <br /> incurred by the Railroad in connection with the Project including, but not limited to, actual <br /> costs of preliminary engineering review,construction inspection, procurement of materials, <br /> equipment rental, manpower and deliveries to the job site and all of the Railroad's normal <br /> and customary additives (which shall include direct and indirect overhead costs) associated <br /> therewith. <br /> SECTION 4. <br /> A. The City, at its expense, shall prepare, or cause to be prepared by others, the detailed plans <br /> and specifications and submit such plans and specifications to the Railroad's Assistant Vice <br /> President Engineering— Design, or his authorized representative, for review and approval. <br /> The plans and specifications shall include all Roadway layout specifications, cross sections <br /> and elevations, associated drainage, and other appurtenances. <br /> B. The final one hundred percent (100%) completed plans that are approved in writing by the <br /> Railroad's Assistant Vice President Engineering—Design,or his authorized representative,are <br /> hereinafter referred to as the"Plans". The Plans are hereby made a part of this Agreement by <br /> reference. <br /> C. No changes in the Plans shall he made unless the Railroad has consented to such changes in <br /> writing. <br /> D. Notwithstanding the Railroad's approval of the Plans, the Railroad shall not be responsible <br /> for the permitting, design, details or construction of the Roadway. <br /> Supplemental Public Road Xing Page 2 of 4 revised January 28, 2010 <br /> Form Approved,AVP-Law <br />