Laserfiche WebLink
BUILDING AMERICA' (W <br />SECTION 5. <br />The Railroad, at the City's expense, shall maintain the crossing between the track tie ends. If, <br />in the future, the City elects to have the surfacing material between the track tie ends replaced with <br />paving or some surfacing material other than timber planking, the Railroad, at City's expense, shall <br />install such replacement surfacing. <br />SECTION 6. <br />A. The City, at its sole cost and expense, shall provide traffic control, barricades, and all detour <br />signing for the crossing work, provide all labor, material and equipment to install concrete or <br />asphalt street approaches, and if required, will install advanced warning signs, and pavement <br />markings in compliance and conformance with the Manual on Uniform Traffic Control <br />Devices. <br />B. The City, at its expense, shall maintain and repair all portions of the Roadway approaches <br />that are not within the track tie ends. <br />SECTION 7. <br />If City's contractor(s) is /are performing any work described in Section 4 above, then the City <br />shall require its contractor(s) to execute the Railroad's standard and current form of Contractor's <br />Right of Entry greement attached hereto as Exhibit C. City acknowledges receipt of a copy of the <br />Contractor's Right of Entry Agreement and understanding of its terms, provisions, and requirements, <br />and will inform its contractor(s) of the need to execute the Agreement. Under no circumstances will <br />the City's contractor(s) be allowed onto the Railroad's premises without first executing the <br />Contractor's Right of Entry Agreement. <br />SECTION 8. <br />Fiber optic cable systems may be buried on the Railroad's property. Protection of the fiber <br />optic cable systems is of extreme importance since any break could disrupt service to users resulting <br />in business interruption and loss of revenue and profits. City or its contractor(s) shall telephone the <br />Railroad during normal business hours (7:00 a.m. to 9:00 p.m., Central Time, Monday through <br />Friday, except holidays) at 1- 800 - 336 -9193 (also a 24 -hour number, 7 day number for emergency <br />calls) to determine if fiber optic cable is buried anywhere on the Railroad's premises to be used by <br />the City or its contractor(s). If it is, City or its contractor(s) will telephone the telecommunications <br />company(ies) involved, arrange for a cable locator, and make arrangements for relocation or other <br />protection of the fiber optic cable prior to beginning any work on the Railroad's premises. <br />SECTION 9. <br />The City, for itself and for its successors and assigns, hereby waives any right of assessment <br />against the Railroad, as an adjacent property owner, for any and all improvements made under this <br />agreement. <br />SECTION 10. <br />Covenants herein shall inure to or bind each party's successors and assigns; provided, no right <br />of the City shall be transferred or assigned, either voluntarily or involuntarily, except by express prior <br />Supplemental Public Road Xing Page 3 of 4 revised January 28, 2010 <br />Form Approved, AVP -Law <br />