Laserfiche WebLink
and/or chemicals to be used on the project. The information contained in the <br />above referenced documents shall be updated with any new information as <br />available. The Director shall be immediately notified of any changes to the <br />above information. <br />c) Uniforms and Vehicle Identification <br />The Contractor shall provide to all field personnel a standard uniform including <br />but not limited to uniform company hats, collared work shirts, pants, jackets, <br />vests and ANSI approved safety shoes. All uniforms will be marked with some. <br />form of company logo or other form of identification. <br />All vehicles and equipment on the project site shall be in operable and working <br />condition, clean appearance without visible damage, dirt graffiti etc. In <br />addition, all vehicles shall have the company's name clearly identified on the <br />right and left side doors. <br />B. SAFETY REQUIREMENTS <br />All work performed under this contract shall be completed with maximum safety as the <br />priority above all other requirements. In the event unsafe work is observed by City staff or <br />otherwise reported, the Director may at his discretion order Contractor to stop performing <br />and pay all costs and or damages resulting from the delay. <br />C. SAFETY NOTIFICATION <br />If Contractor identifies a potential safety issue, Contractor shall: <br />1. Notify the public that potentially unsafe conditions exist by installing yellow "Caution <br />Tape" and "A" frame barricades or equal substitute around the condition. <br />2. Notify the Director of the condition first by phone and then in writing (e-mail is <br />acceptable) including digital photographs of the potential safety concern if possible. <br />Once the Contractor has notified the City and the public of the condition, as specified <br />above, Contractor shall have no further responsibility regarding the condition. <br />D. UNDERGROUND ALERT SYSTEMS <br />Underground Alert Systems (telephone number 1-800-422-4133) must be notified 48 -hours <br />in advance prior to any excavation work. . <br />E. PROPERTY DAMAGE <br />Any damage to private property caused by Contractor shall be immediately reported to the <br />property owner. Contractors shall pay for any damage caused to private property in <br />performing this agreement. <br />F. ACCESS TO PRIVATE PROPERTY <br />2 <br />