Laserfiche WebLink
10.1.2 Contractor shall verify all base distances, pitching rubber distances and <br />pitching mound heights per the Little League, Pony/Colt League <br />specifications for each specific field. Contractor shall repair any <br />specifications not being met on any field. <br />10.1.3 In addition, contractor shall install 1/2" new Gail Materials "Pro -gold <br />with Stabilizer" (brickdust) to in -fields at all diamonds (minimum 26 <br />tons per Girls Softball/Major Little League Field and minimum 40 tons <br />per Junior/Senior Little League Field). Also, the contractor shall install a <br />minimum of 1 ton of Turface calcite clay per Girls Softball/Major Little <br />League Field and 2 tons of Turface calcite clay to Junior/Senior Little <br />League Fields Responsibility for and purchase of necessary materials <br />shall be at contractor's expense. <br />Note: The City has the right to move brickdust and Turface <br />materials to other infields under this agreement should <br />they decide that an infield or infields do not require <br />additional materials a particular year. <br />11.0 Work To Be Completed "AS DIRECTED" <br />11.1 Replace Base ANCHORS as directed. (This will be considered extra work.) <br />Note: City of Santa Ana use's the Hollywood base anchoring <br />system. Contractor shall install base anchors into the <br />ground per manufacturer's standards. Top of stake shall <br />be approximately 2" below the surface grade so that the <br />base sits level and flush against the surface on all sides. <br />11.2 Replace Bases as directed. (This will be considered extra work.) <br />Note: City of Santa Ana shall be responsible for supplying all <br />necessary base anchors and/or bases to the contractor as <br />needed. <br />11.3 Replace or Remove/Level/Re-Install home plates as directed. <br />11.4 Replace or Remove/Level/Re-Install pitching rubbers as directed. <br />Note: City of Santa Ana shall be responsible for supplying all <br />necessary home plates and/or pitching rubbers to the <br />contractor as needed. <br />11.5 When given direction to complete "as directed" work, contractor shall complete the <br />directed work on the next working day. <br />viii <br />