Laserfiche WebLink
ATTACHMENT 7 <br />Santa Ana Parks, Recreation and Community Services Agency Attachment 7 <br />Landscape Propsoal Work Sheet <br />Contractor Name: Master Lanscape and Maintenance AEW #: <br />Park/Location: Centennial, DYSC #3 <br />Project Description: <br />Prepared by: <br />Labor Classification <br />Hrly. Rate Hours <br />Class Subtotal <br />1 Landscape Lead Worker <br />21.00 16.00 <br />336.00 <br />2 Landscape Maintenance <br />Worker <br />18.00 <br />0.00 <br />3 Lead Tree Trimmer <br />30.00 <br />0.00 <br />4 Tree Trimmer <br />25.00 <br />0.00 <br />5 Irrigation Specialist (as <br />specified) <br />35.00 <br />0.00 <br />61 Irrigation Assistant <br />20.001 1 <br />0.00 <br />7 QAC Pesticide Operator <br />40.001 <br />0.00 <br />8 Pesticide Assistant <br />Operator <br />25.00 <br />0.00 <br />9 <br />Labor Subtotal <br />336.00 <br />Materials Description <br />Qty. Unit Unit Cost 15%Mark-Up <br />Item Sub -Total <br />1 Black forest mulch, <br />Aguanaga <br />10.00 Yams 26.00 39.00 <br />299.00 <br />2 <br />0.00 <br />0.00 <br />3 <br />0.00 <br />0.00 <br />4 <br />0.00 <br />0.00 <br />5 <br />0.00 <br />0.00 <br />6 <br />0.00 <br />0.00 <br />7 <br />0.00 <br />0.00 <br />8 <br />0.00 <br />0.00 <br />9 <br />0.00 <br />0.00 <br />10 <br />0.00 <br />0.00 <br />Materials Subtotal <br />299.00 <br />Equipment Description <br />Hours Hrly. Rate 15% Mark-Up <br />Item Sub -Total <br />1 Roto Tiller, Zephyr Turf Care <br />4.00 26.00 15.60 <br />119.60 <br />2 <br />0.00 <br />3 <br />0.00 <br />4 <br />0.00 <br />Equipment Subtotal <br />119.60 <br />Project Total 754.60 <br />