My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PBS&J 3a
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
P (INACTIVE)
>
PBS&J 3a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 2:58:55 PM
Creation date
4/28/2010 1:27:10 PM
Metadata
Fields
Template:
Contracts
Company Name
PBS&J (ATKINS NORTH AMERICA INC)
Contract #
A-2008-128-001
Agency
Planning & Building
Council Approval Date
6/2/2008
Expiration Date
6/30/2010
Insurance Exp Date
9/30/2010
Destruction Year
2016
Notes
Amends A-2008-128 Amended by A-2008-128-003 - 4/1/11 OFFICIAL NAME CHANGE TO ATKINS NORTH AMERICA INC.
Document Relationships
PBS&J 3
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
PBS&J 3b
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br />Proposal to Prepare the Transit Zoning Code <br />(SD 84A and SD 84B) EIR <br />January 2010 <br />SECTION 1 Project Understanding <br />This attachment and revised scope of work and fee presents a means to complete a major revision to <br />the existing Administrative Draft EIR for the Renaissance Specific Plan that was completed in 2007. <br />The update will reflect the fact that the project no longer consists of a specific plan, but rather two <br />combined Specific Developments (84A and 84B), as well as the demolition of approximately 30,000 <br />square feet of existing structures, the construction of 220 affordable housing units and a community <br />center on 7.5 acres of land. The revised project is known hereafter as Transit Zoning Code (SD 84A <br />and SD 84B). The Transit Zoning Code (SD 84A and SD 84B) consists mainly of the same project <br />area as the former Renaissance Specific Plan with the exception that the area located on the south <br />side of the planning area that was carved out in the previous plan, is now being analyzed in this EIR <br />and is seeking approval as SD 84B. The revised project includes the preparation of a revised Traffic <br />Study (to be performed by KOA Corporation), new air quality and noise modeling, a complete <br />revision of the Water Supply Assessment, and new Greenhouse Gas analysis. In addition, the <br />changes in land use and densities, buildout assumptions, the aforementioned demolition and <br />construction project, as well as the revised project boundary will be reflected throughout the EIR as <br />necessary. During the revision, PBS&J will also update each section as necessary to reflect any <br />changes in regulatory framework or new conditions not previously analyzed. <br />The following scope of work includes the aforementioned revisions to the EIR and starts where the <br />former project left off; after the delivery of the Renaissance Specific Plan Administrative Draft EIR <br />version 1. Unbilled fees remaining in the former contract that are required to complete the EIR as <br />well as fees for the revisions to the Administrative Draft EIR and revised technical analysis are <br />included. <br />SECTION 2 Scope of Services and Task <br />Descriptions <br />PBS&J had previously prepared the Administrative Draft EIR for the project. PBS&J will take <br />responsibility for the required revisions to the EIR, revised technical analyses, data compilation, <br />
The URL can be used to link to this page
Your browser does not support the video tag.