Laserfiche WebLink
Attachment A <br />Proposal to Prepare the Transit Zoning Code <br />(SD 84A and SD 84B) EIR <br />January 2010 <br />SECTION 1 Project Understanding <br />This attachment and revised scope of work and fee presents a means to complete a major revision to <br />the existing Administrative Draft EIR for the Renaissance Specific Plan that was completed in 2007. <br />The update will reflect the fact that the project no longer consists of a specific plan, but rather two <br />combined Specific Developments (84A and 84B), as well as the demolition of approximately 30,000 <br />square feet of existing structures, the construction of 220 affordable housing units and a community <br />center on 7.5 acres of land. The revised project is known hereafter as Transit Zoning Code (SD 84A <br />and SD 84B). The Transit Zoning Code (SD 84A and SD 84B) consists mainly of the same project <br />area as the former Renaissance Specific Plan with the exception that the area located on the south <br />side of the planning area that was carved out in the previous plan, is now being analyzed in this EIR <br />and is seeking approval as SD 84B. The revised project includes the preparation of a revised Traffic <br />Study (to be performed by KOA Corporation), new air quality and noise modeling, a complete <br />revision of the Water Supply Assessment, and new Greenhouse Gas analysis. In addition, the <br />changes in land use and densities, buildout assumptions, the aforementioned demolition and <br />construction project, as well as the revised project boundary will be reflected throughout the EIR as <br />necessary. During the revision, PBS&J will also update each section as necessary to reflect any <br />changes in regulatory framework or new conditions not previously analyzed. <br />The following scope of work includes the aforementioned revisions to the EIR and starts where the <br />former project left off; after the delivery of the Renaissance Specific Plan Administrative Draft EIR <br />version 1. Unbilled fees remaining in the former contract that are required to complete the EIR as <br />well as fees for the revisions to the Administrative Draft EIR and revised technical analysis are <br />included. <br />SECTION 2 Scope of Services and Task <br />Descriptions <br />PBS&J had previously prepared the Administrative Draft EIR for the project. PBS&J will take <br />responsibility for the required revisions to the EIR, revised technical analyses, data compilation, <br />