Laserfiche WebLink
<br /> ~ . <br /> F. Working Day <br /> The Contractor shall conform to Subsection 6-7.2 of the SSPWC. The Contractor activities shall be <br /> confined to the hours from 7:00 a.m. to 3:30 p.m., Monday through Friday. Deviation from these hours will <br /> not be permitted without the prior consent of the CPM or designee, except in emergencies in involving <br /> immediate hazard to persons or properly. <br /> G. Inspections <br /> The City shall have the right to inspect any work performed to ensure that the work is being and has been <br /> perfom~ied in accordance with the applicable federal, state and/or bcal requirements and this agreement. <br /> All work found in such inspections not to conform to the applicable requirements shad be corrected by the <br /> Contractor and the City shall have the right to withhold payment to the Contractor until the work is corrected. <br /> H. Protection of the Public and Damages to Existing Structures <br /> 1. The Contractor shall exercise caution at all times for the protection of persons and property. All fines, <br /> penalties and/or repair charges resufiing from the Contractor's actions shall be the sole responsibility of <br /> the Contractor. <br /> 2. The Contractor shall not permit plating or use equipment in such a manner as to block vehicle traffic <br /> lanes or create safety hazards. The Contractor shall be responsible for the use of all appropriate <br /> warning traffic safety devices. <br /> 3. Methods proposed by the Contractor and approved by the City shall not harm, deface or damage the <br /> item being servic~l or the surroundings. In the event chat a structure is damaged in the course of work, <br /> the Contractor shall be solely responsible for its repair or replacement. <br /> 4. Closing off completely of sidewalks shall be avoided, unless necessary to complete work. <br /> I. Invoices <br /> 1. All invoices for work performed under this contract shall be submitted electronically in an Excel 2003 <br /> format or other format approved by the CPM. <br /> 2. The Contractor shall submit a monthly invoice by the 15'" of the month to the City for the services <br /> rendered in the prior month. <br /> 3. The invoice shall include the following: <br /> a. Contractor's invoice number <br /> b. Agreement number (provided by City) <br /> c. Work order number (provided by City) <br /> d. Work site address/iocation <br /> e. Before and after photographs <br /> f. Beginning and ending dates for services <br /> g. Unit cost, subtotals and total for invoice <br /> Exhibit A - Continued <br /> 10 <br /> <br />