My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUCK CONSULTANTS, LLC 1 -2010
Clerk
>
Contracts / Agreements
>
B
>
BUCK CONSULTANTS, LLC 1 -2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2014 11:35:11 AM
Creation date
5/6/2010 8:48:18 AM
Metadata
Fields
Template:
Contracts
Company Name
BUCK CONSULTANTS LLC
Contract #
N-2010-038
Agency
FINANCE & MANAGEMENT SERVICES
Expiration Date
12/31/2010
Insurance Exp Date
5/26/2013
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />March 25, 2010 <br />Page 6 <br />Appendices <br />Appendix A— Actuarial Assumptions and Methods ............................... .............................10 <br />Appendix B —Summary of Plan Provisions .......................................... .............................14 <br />Appendix C — Summary of Employee Data ........................................ ............................... 16 <br />Appendix D — Glossary of Terminology .............................................. ............................... 18 <br />Once each valuation report is complete we will submit a draft report to you for review. We <br />will discuss the reports with you and incorporate your comments into the final reports. The <br />expected time needed to complete each valuation is four to six weeks after receiving the <br />census data described above. <br />Section 5 – Total All- Inclusive Maximum Price <br />This section outlines the expected cost for this project. As a consulting firm, we charge fees <br />for our services on a time and expense basis so that our clients are assured of receiving <br />maximum value. Buck will perform this project on a time and expense basis, with a limit on <br />our fees to a guaranteed amount. We will charge only for the amount of work actually <br />performed. <br />The total cost is expecndto t- <br />" angfrom$15,000 to $20,000, with a not to exceed cost of <br />$20,000. This includ ace -to -face meetings; the first to discuss the project and the <br />current City benefit plans and the second to present the final reports and discuss the findings <br />of the reports. The expected time needed to complete this project is four to six weeks after <br />receiving the census data described above. <br />Section 6 – Rates by Partner, Supervisory and Staff <br />Detailed estimated costs for this project include approximately 40 hours of programming and <br />valuation data work by an associate level actuary at $250 per hour and 8 hours of director <br />level actuarial peer review and meeting attendance at $450 per hour. Additional Principal <br />consulting input of around 4 hours would be billed at $500 per hour. This gets us to an <br />estimated total cost of $15,600 and under the not to exceed quote of $20,000 if more services <br />are needed. <br />buckconsultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.