Laserfiche WebLink
Santa Ana River Channel <br />E01 -R 1551, R1553 <br />WM -5 Stolid Waste Management <br />• For disposal of hazardous waste. sere wii -o, Hazardous lVaste Management. Have <br />hazardous waste hauled to an appropriate disposal and /or recycling facility <br />• Salvage or recycle useful vegetation debris, packaging and surplus building materials when <br />practical. For example, trees and shrubs from land clearing can be used as a brush barrier, <br />or converted into wood chips, then used as mulch on graded areas. Wood pallets. cardboard <br />boxes, and construction scraps can also be recycled. <br />Costs <br />All of the above are low cost measures. <br />Inspection and Maintenance <br />• Inspect and veriA? that actiNrity —based BAIPs are in place prior to the commencement of <br />associated activities. While activities associated with the BMP are mider wad =, inspect weekly <br />during the rainy season and of N-o -week intervals in the non - rainy season to verify <br />continued BMP implementation. <br />• Inspect BDIPs subject to non- stormlater discharge dailywhile non- stormwater discharges: <br />occur <br />■ Inspect construction tivaste area regularly. <br />■ Arrange for regular waste collection. <br />References <br />Processes, Procedures and Methods to Control Pollution Resulting liom All Construction <br />Activity. 43ofo -73 -007, USEPA, 1078. <br />Stormwater Quality Handbooks - Construction Site Best Management Practices (BIIPs) Manual, <br />State. of California Department of Transportation (Caltrans), November 2000. <br />Storurwater Management for Construction Activities; E]eveloping Pollution Prevention Plans <br />and Best Management Practice, EP?. 632- R- g2oo5; USEPA, April rgga. <br />4 of G California Stormwrater BW Handbook January 2043 <br />Construction <br />%v%Tw. cabm phandbooks.com <br />Edna Park Lease (06.16.09) <br />