Laserfiche WebLink
MEMORANDUM <br />Paul Walters <br />To; In(erim City Manager <br /> <br />Dale: Sepfember1,2011 <br />Raul Godinez, Executive Director <br />From; Public Works Agency <br />Subj?t; PROJECT NO, 08.5011, 08.50211 06.6022 AND 085023, TRAFFIC SIGNAL <br />INSTALLATIONS AT WILLITS 8 SULLIVAN, RAITT & GLENWOOD, HARBOR 8 KENT AND <br />SANTA ANA BL & FLOWER. -FEDERAL PROJECT NO. SR2SF5063 I120?, 5R2SF-5063 <br />(124j, HSIPL-5063 j118)AND HSIPL-5063 (119) <br />CHANGE ORDER N0.2 <br />Contractor LincoloPacifcBuilders,lnc. <br />4501 Lifllejohn SUeet <br />BaldvNn Park, CA 91706 <br />Project Description: TRAFFIC SIGNAL INSTALLATIONS AND MODIFICATION AT <br />FOUR LOCATIONS <br />Change Order Number 2 Amount: $1,800.00 <br />GlenwoodlRait1?08-5021) Flowed5antaAna?085023) <br />Account Number: 14811611 03211660 <br />ACCOUNT 66220 66220 <br />Work Order: 08502101028 0850230128 <br />Amount $3,900 $3,900 <br />OriginalConlractCosC $673,515 <br />%atOriginal <br />Amountof The <br />Change Order', $1,800 1.16% <br />Previously Approved $62,556 9.26% <br />Change Orders: <br />Ta?IChangeOrders$10,350 1042% <br />REASON FOR CHANGES <br />The contract documents require'mslallagon of new treffo signal poles al ihe'mtemeotlons of <br />Glendwrood Place and Railt 5ireel and Flower Sireel and Santa Ana Boulevard. During the <br />installagon, it was disccuered that overhead power Imes would interfere with the installation of <br />these new Imffc signal poles. Therefore it was recommended to shorten Iha irafflc signal <br />poles around these lines. This work was done on a timeā€¢and-materials basis. Prior approval <br />was obtained on July21, 20011, (PC0 No.4jFINAL COST=$1,800 <br />