My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R. J. NOBLE COMPANY
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
R. J. NOBLE COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:12:00 PM
Creation date
5/6/2010 4:14:19 PM
Metadata
Fields
Template:
Contracts
Company Name
R. J. Noble Company
Contract #
10-7503
Agency
Public Works
Council Approval Date
4/5/2010
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 10717 <br />RFA Change Order No. 1 <br />October 4, 201 O <br />Page 2 <br />b. Field Condition reveals that Hesperian between Pine and Myrtle has curbs only. <br />Since there is no gutter plate to match the new pavement with, and in order to <br />ensure proper drain adjacent to the curb, a proposed flow line was established <br />and staked. Staking of the flow line revealed that several driveway approaches <br />will be lower than the pavement. This change order provides for reconstruction <br />of these driveway approaches after the street is paved. <br />AGREED PRICE _ $12,758 <br />c. Under a standing agreement, personnel of the County's material testing <br />laboratory have been providing testing for the City's construction projects for <br />years. They tested sub-grade soil, base material, asphalt concrete pavement, <br />etc. However, due to a reduction in work forces, they were no longer able to <br />provide those tests. The City had a backup testing firm under contract but funds <br />in that contract were mostly expended by previous phases of the residential <br />street repair projects. In order to ensure the work be completed according to the <br />project specifications, City staff requested the contractor to retain the services of <br />the testing firm and this change order is to reimburse the contractor for the costs <br />of these services. <br />AGREED PRICE _ $26,497 <br />? APPROVED AS TO FUNDS AND ACCOUNTS <br />Raul Godinez, 11 ( ? Francisco Gutierrez ?„? <br />Executive Director v Executive Director <br />Public Works Agency Finance and Management Services Agency <br />PROJECTS/C010.7503\ RFA CO 7
The URL can be used to link to this page
Your browser does not support the video tag.