Laserfiche WebLink
extent possible, any interference with the Public Safety 800 MHz <br /> Countywide Coordinated Communications System (CCCS). Similar <br /> consideration shall be given to any other existing or proposed wireless <br /> communications facility that may be located on the subject property. <br /> <br /> 7. At all times, the permit applicant shall not prevent the City of Santa Ana <br /> from having adequate spectrum capacity on the City's 800 MHz radio <br /> frequency. <br /> 8. Before activating its facility, the permit applicant will submit to a post- <br /> installation test to confirm that "advanced planning and frequency <br /> coordination" of the facility was successful in not interfering with the City of <br /> Santa Ana Public Safety radio equipment. This test will be conducted by <br /> the Communications Division of the Orange County Sheriff-Coroner <br /> Department or a Division-approved contractor at the expense of the <br /> applicant. This post-installation testing process shall be repeated for <br /> every proposed frequency addition and/or change to confirm the intent of <br /> the "frequency planning" process has been met. <br /> 9. The permit applicant shall provide a 24-hour phone number to which <br /> interference problems may be reported. This condition will also apply to <br /> all existing facilities in the City of Santa Ana. <br /> 10. The permit applicant will provide a "single point of contact" in its <br /> Engineering and Maintenance Departments to insure continuity on all <br /> interference issues. The name, telephone number, fax number and a-mail <br /> address of that person shall be provided to the City's designated <br /> representative upon activation of the facility. <br /> 11. The permit applicant shall insure that lessee or other user(s) shall comply <br /> with the terms and conditions of this permit, and shall be responsible for <br /> the failure of any lessee or other users under the control of permit <br /> applicant to comply. <br /> 12. The permit applicant shall provide a coverage and cell site location map <br /> for each existing and proposed facility in Santa Ana. <br /> 13. Locate all equipment and related appurtenances (Appleton plug and <br /> electric meter) on the inside of the existing equipment enclosure or inside <br /> the building and underground all electrical power from the utility source <br /> shown on the approved site plan. <br /> 14. Conditional Use Permit No. 2010-02 expires 10 years from the date of City <br /> Council approval. <br /> Resolution No. 2010-06 <br /> Page 6 of 6 <br /> 31 A-18 <br /> <br />