My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19D - RFP_GO_LOCAL_PROGRAM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
05/17/2010
>
19D - RFP_GO_LOCAL_PROGRAM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:09:00 PM
Creation date
5/12/2010 3:04:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19D
Date
5/17/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR PROPOSALS <br /> SANTA ANA TRANSIT VISION PUBLIC OUTREACH <br /> I. INTRODUCTION <br /> The public outreach program shall communicate information about Santa <br /> Ana's Fixed Guideway Project, the Santa Ana Regional Transportation <br /> Center (SARTC) Master Plan, and related projects to the public in order to <br /> gain community understanding and solicit community feedback. Among other <br /> things, the public outreach campaign should clearly communicate anticipated <br /> community benefits, potential community impacts, and possible economic <br /> development opportunities associated with the projects. <br /> <br /> II. PROJECT BACKGROUND <br /> The Santa Ana Fixed Guideway Project will serve as local connector to <br /> regional and national rail, bus, and airport transportation services provided at <br /> the Santa Ana Regional Transportation Center (SARTC). It will also serve as <br /> a local circulator in the downtown/government center area, the Station District <br /> and several other Santa Ana neighborhoods. <br /> The desired attributes of the Santa Ana Fixed Guideway system are: <br /> 1. Stimulate land development and economic activity <br /> 2. Integrate well with the surrounding community <br /> 3. Provide connectivity between regional rail and bus services at SARTC <br /> and major destinations <br /> 4. Ensure that passenger safety and security are adequately addressed <br /> 5. Use clean energy <br /> 6. Be attractive, comfortable, friendly, accessible and easy to maintain <br /> 7. Integrate well with bicycle and pedestrian activity <br /> 8. Provide acost-effective system <br /> 9. Meet future mobility needs <br /> 10. Maximize use of existing right-of-way <br /> 11. Engage with business and activity centers along the line <br /> 12. Minimize construction impacts <br /> The SARTC Master Plan will serve as the blueprint for addressing <br /> transportation provider and passenger needs at SARTC for the next 30 years <br /> and beyond. The goals for the SARTC Master Plan are to: <br /> 1. Provide a transportation facility where people can easily transfer <br /> between services <br /> 2. Design a transportation facility that integrates well with the surrounding <br /> community <br /> 1 <br /> 19D-3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.