My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - METERED WATER RATE AND SEWER CHARGE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
06/07/2010
>
75B - PH - METERED WATER RATE AND SEWER CHARGE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:03:37 PM
Creation date
6/3/2010 11:39:04 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
6/7/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Infrastructure C.I.P. Considerations <br /> <br /> The City's water system consists of approximately 476 total miles of water mains. About 217 miles of this total are old cast iron mains <br /> that will need to be replaced due to leaks caused by corrosion. Approximately 103 miles of mains are more than 50 years old and 23 <br /> miles are over 75 years old. The estimated life of water mains is about 75 years. With 476 miles, we should be replacing at least 6 <br /> miles per year. <br /> Age of Water Mains Water Main Material <br /> 23 Miles ¦ 0-49 Years Old <br /> ' ~ ¦ Cast Iron <br /> - ; . <br /> ¦ 50-74 Years <br /> Old ¦ Other <br /> 75+ Years Old y - <br /> For purposes of calculating a rough budgetary estimate of the cost of the entire water distribution system, the following assumptions will <br /> be used: <br /> All new water mains will be 8" diameter. This will result in a low estimate, since many pipelines are larger than 8" (Our system <br /> includes water mains from 6" to 30" in diameter, however 92% are 12" and smaller). <br /> The cost for 8" water main (including meters, valves and fire hydrants) is $230 per linear foot. This cost includes $170 per <br /> linear foot for construction and an additional 35% for design, inspection, street repaving and other contingencies (10% for <br /> design, 10% for inspection, and 15% for repaving and contingencies). <br /> Based on the above figures and assumptions, the total replacement cost of the water main system is approximately $578,000,000. <br /> In addition to water mains, water production facilities are also funded out of the CIP. These facilities include reservoirs, pump stations <br /> and wells. While the life span of these facilities can vary, for rough budgeting purposes a 75 year average life is reasonable. All of <br /> these types of facilities will require either replacement or significant rehabilitation in that timeframe. The City's 2010 Property Schedule <br /> (used for insurance purposes) shows the total replacement cost for all water production facilities to be $89,000,000. <br /> The total replacement cost of the entire water distribution system (mains and productions facilities) is $667,000,000. Assuming a 75 <br /> year life cycle for replacement, the annual water CIP would need to be $8.9 million. We are planning to spend $6 million during FY <br /> 2010/11 for water CIP improvements, which includes $1.2 million from the proposed 2% water rate increase and a $3.1 million prior <br /> year carry forward from savings in the water fund. This prior year carry forward amount varies widely from year to year and should not <br /> be considered along-term revenue source for the water CIP. <br /> Capital Improvement Costs <br /> v Current Capital Improvement J Prior Year Carry Forward u 2 % Water Rate Increase <br /> $10,000,000 ~ _ 8.9 M <br /> $8,000,000 1.2 M <br /> $6,000,000 N... <br /> 3.1 M - <br /> $4,000,000 <br /> % <br /> $2,000,000 ~1J M <br /> -----r----------- --f <br /> FY 2010/11 CIP 75 Year Replacement Cyle <br /> Exhibit 2 <br /> 75B-7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.