My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS CORPORATION AMERICAS 7b
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
URS CORPORATION AMERICAS 7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:53:21 PM
Creation date
6/3/2010 11:48:30 AM
Metadata
Fields
Template:
Contracts
Company Name
URS CORPORATION AMERICAS
Contract #
A-2008-141-001
Agency
PLANNING & BUILDING
Expiration Date
12/31/2011
Insurance Exp Date
5/1/2011
Destruction Year
2018
Notes
Amends A-2007-169, A-2008-141 Amended by A-2008-141-002, -03
Document Relationships
URS CORPORATION 7 (2)
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
URS CORPORATION AMERICAS 7a
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
URS CORPORATION AMERICAS 7c
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
URS CORPORATION AMERICAS 7d
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
beyond the locally preferred build alternative (as described in the 1990 Final EIS/EIR) will be assessed. If a <br />higher level NEPA document is determined to be required, then this will be communicated to the City and a <br />scope/cost amendment for this work will be provided. <br />Using the information contained in the technical reports, along with additional information and analyses that <br />are performed as necessary, a Screencheck Re -Validation Form and Written Evaluation will be prepared and <br />submitted to the City and Caltrans for concurrent review. The document will be submitted with the NEPA <br />QA/QC External Certification signature sheet whereby each technical study author attests to the validity, <br />accuracy, and completeness of each technical study. Following the City and Caltrans review of the <br />Screencheck submittal, URS will revise the document as necessary. Following a comment resolution meeting <br />with the City and Caltrans, as necessary, URS will prepare the Final Re -Validation Form and Written <br />Evaluation, accompanied by a response -to -comment matrix, and submit the document to the City and <br />Caltrans for final concurrence. It is assumed that no additional comments will be received as part of the <br />concurrence review. The NEPA Re -Validation Form / Written Evaluation do not need to, and will not, be <br />circulated for public review. <br />Assumptions/Deliverables: <br />➢ A total of 10 copies of the Screencheck NEPA Re -Validation Form and Written Evaluation will be <br />delivered. <br />➢ A total of 10 copies of the Final Re -Validation Form and Written Evaluation will be delivered. <br />D. PROJECT SCHEDULE <br />The following schedule presents the key tasks that will be required to complete the CEQA and NEPA <br />re-evaluations. The duration associated with each task are shown, as is the relational logic between the <br />various tasks. The schedule presented below is based on the assumptions described above (e.g., number <br />of rounds of review of studies by the City and Caltrans). <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.