My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - PROPOSED BUDGET & MISC FEES FY 2010-11
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
06/07/2010
>
75A - PH - PROPOSED BUDGET & MISC FEES FY 2010-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:03:36 PM
Creation date
6/3/2010 12:19:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
6/7/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> RESOLUTION 2010 <br /> PROPOSED <br /> REVENUE FY 09-10 FY 10-ll <br /> ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES FEES <br /> SECTION V FIRE DEPARTMENT <br /> Level 3 -Freeway traffic accident response, advanced scene stabilization Per Hour 0.00 720.00 <br /> and hazardous materials assessment. Typical of two Engine companies <br /> and/or Truck companies. <br /> 53502 Risk Management and Prevention Program <br /> 1st Eight (8) Hours 851.25 851.25 <br /> Each Hour or Fraction OVER Eight (8) Hours 83.25 83.25 <br /> 53500 Fire Department Annual Inspection: <br /> 0-2,500 square feet 47.75 47.75 <br /> 2,501- 5,000 square feet 71.50 71.50 <br /> 5,001-10,000 square feet 122.00 122.00 <br /> 10,000- over 245.00 245.00 <br /> ABOVE & UNDERGROUND STORAGE TANKFEES <br /> 51502 Annual Tank Fees Each 403.00 403.00 <br /> (includes tanks not currently in use) <br /> Officially Abandoned Tanks <br /> 51502 Installation of New Underground Tanks: <br /> Flammable Liquids 1-3 Tanks 783.75 783.75 <br /> Each Add'1 Tank 234.75 234.75 <br /> Hazardous Chemicals Each Tank 313.00 313.00 <br /> Includes Plan Check, Resubmittals & Field Inspections <br /> (working hours) <br /> 51502 Above Ground Storage Tank Plan Review Per Tank 189.50 189.50 <br /> 51502 Systems Modificationslupgrades Per Hour 116.75 116.75 <br /> 51502 Miscellaneous Inspections <br /> Drafting Per Visit 116.75 116.75 <br /> Monitoring Certification Per Visit 116.75 116.75 <br /> Testing Product Lines Separately Per Visit 116.75 116.75 <br /> Unauthorized Releases Per Hour 116.75 116.75 <br /> 51502 Underground Storage Fees <br /> Tank Removal <br /> Tank Removal 1-3 Tanks 627.25 627.25 <br /> Each Additional Tank Per Tank 139.00 139.00 <br /> Field Inspection <br /> First three (3) hours Hour <br /> Each Additional hour or fraction Add'1 Hour 116.75 116.75 <br /> 51502 Inspection(s) Required Due to Leaks or <br /> Unauthorized Releases <br /> Inspection <br /> Per Hour Hour 116.75 116.75 <br /> Each Additional hour or fraction Add'1 Hour 116.75 116.75 <br /> 51502 Underground Storage Tank <br /> Regulations and Procedures Book Each 5.15 5.15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.