Laserfiche WebLink
CHAPTER 3 Findings Regarding Project <br />Alternatives <br />3.1 INTRODUCTION <br />The EIR prepared for Transit Zoning Code considered six 6 alternatives to the Proposed Project. <br />jeet. <br />Pursuant to Section 15126.6(a) of the CEQA Guidelines, the prit ary intent of an alternatives evaluation <br />is to "describe a range of reasonable alternatives to the project, or to the location of the project, which <br />-would feasibly attai <br />