My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22A - TRAFFIC SIGNAL
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
06/21/2010
>
22A - TRAFFIC SIGNAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:02:55 PM
Creation date
6/17/2010 11:33:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
22A
Date
6/21/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Award for Traffic Signal Systems Upgrade Equipment <br /> June 21, 2010 <br /> Page two ' <br /> Bids were solicited and opened on May 21, 2010, and evaluated. The bid received from Safetran <br /> Traffic Systems, Inc. is responsive to the specifications and meets the City's requirements. To allow <br /> for unanticipated order modification, an additional five percent contingency has been included in the <br /> award amount. <br /> Secondly, according to the City's purchasing code, sole source criteria has been met for awards to <br /> GDI Communications LLC for internal dual modems and internal mount modems that provide the <br /> required speed and are fully compatible with the City's MIST central traffic signal system <br /> communication requirements. In addition, the Public Works Agency Adaptive Downtown Traffic Signal <br /> Project in 2008 formally standardized controllers from Econolite Control Products, Inc. as the <br /> manufacture of the City's traffic signal controllers. Staff recommends two sole source awards with <br /> five percent contingencies included in each award amount. <br /> FISCAL IMPACT <br /> Funds are available in the Measure M Fund (no. 03217660-66220). <br /> APPROVED AS TO FUNDS AND ACCOUNTS: <br /> ~ <br /> Raul Godinez II Francisco Gutierrez <br /> Executive Directo Executive Director <br /> Public Works Agency Finance & Management Services Agency <br /> <br /> KM <br /> 22A-2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.