Laserfiche WebLink
Rehabilitation Projects Receiving > $25,000 (Rehabilitation Hard Cost) <br />• Must have a risk assessment or presume the presence of lead-based paint. <br />• Must abate all lead hazards. <br />• Must use certified workers <br />• Must follow HUD's safe work practices <br />• Must obtain clearance <br />PAINT <br />New Paint <br />• Reputable manufacturer • Latex (exterior & interior) <br />• Highest quality <br />Preparation <br />• All surfaces to be painted shall be properly shall be properly prepared. <br />• Wood surfaces shall be clean and all loose and peeling paint shall be removed. Remaining paint <br />edges shall be feather sanded. <br />• All loose and scaling stucco shall be removed. <br />• Holes and cracks shall be filled with an appropriate material and finished so that they blend into <br />the surrounding area. <br />• Damaged and deteriorated window glazing putty shall be replaced with new putty. <br />• All joints shall be caulked. <br />• Raw (exposed) wood and metal shall be properly primed <br />Painting <br />• All exterior wood surfaces shall receive a complete and even coverage of high-quality exterior- <br />grade latex paint. <br />• All exterior stucco surfaces shall receive a complete and even coverage ofhigh-quality exterior- <br />grade stucco paint. <br />• All interior walls shall receive a complete and even coverage of interior-grade latex paint. Use <br />satin or semi-gloss on doors, trim and in kitchens and bathrooms. <br />• Shoddy workmanship will not be accepted. <br />FLOOR COVERING <br />Carpet 8~ Pad <br />Carpet that is damaged or deteriorated beyond feasible repair shall be replaced. Carpet that is <br />unsanitary and cannot be satisfactorily cleaned shall be replaced. Replace aged carpet that has five or <br />less years of practical utility. <br />New Carpet & Pad <br />• Reputable manufacturer Density of 2000 <br />• 1/2 "thick, 6.5 re-bond pad • Twist rating of 5 <br />• Nylon, olefin, polyester, recycled materials <br />or blend <br />• All surfaces shall be clean, smooth and structurally sound. <br />• Carpeting shall be installed using a minimal number of pieces. <br />• All transition areas shall be properly secured and edges tacked. <br />• All seams shall be hot taped and virtually invisible. <br />Page 2 of 8 <br />