Laserfiche WebLink
Pool Structure Routine Maintenance and Re air <br /> 20 Repair interior pool and fountain cracks and leaks (pool or liner) caused by normal age <br /> and wear. Cracks and leaks caused by extraordinary cause, i.e., vandalism, earthquake, do <br /> not a I <br /> 21 Re lace broken or missin skimmer lids and drain covers as necessa <br /> C.1.1.2 Responsibilities Excluded. Pool and fountain maintenance and repair services covered <br /> by this specification exclude the tasks shown in the table below. <br /> Tasks Excluded from Pool and Fountain Maintenance and Re air <br /> Facili Maintenance and Re air <br /> 1 Paint interior and exterior of um /filter room <br /> 2 Maintain um /filter room e.., li hts, ventilation <br /> 3 Re air buildin electrical com onents <br /> 4 Re lace lam s for azea and eneral li htin <br /> 5 Re air ower anels, switches, outlets, etc. <br /> Grounds and Fencin <br /> 6 Cut rass <br /> 7 Trim shrubbe <br /> 8 Rake leaves and rass <br /> 9 Re air fences and ates (includin locks) <br /> 10 Perform other rounds work (e.., lant flowers) <br /> 11 Re air or re aint si ns <br /> C.l .l .3. Frequency of "daily" tasks shall be one day per week on Wednesday unless otherwise directed by <br /> the Director's Representative. Contractor shall maintain a set schedule for providing the daily tasks. <br /> C.1.2 Background Information <br /> C.1.2.1 Place of Performance. The place of performance for pool and fountain maintenance and <br /> repair services is the downtown Second Street Mall and the City of Santa Ana Civic Center Authority <br /> areas. <br /> C.1.2.4 Bid Requirement. Prior to contract awazd, any bidder may be required at any time to <br /> demonstrate to the Director that they can successfully perform maintenance work of the type involved in <br /> this Agreement and that he possesses suitable equipment to perform the work. <br /> C.1.3 Personnel <br /> C.1.3.1 Project Foreman. The Contractor shall provide a Project Foreman who must retain an <br /> Aquatic Facility Operator Certificate (AFO) or a Certified Pool & Spa Operator Certificate (CPO) and to <br /> be available during the normal hours of operation as specified in paragraph C.1.6 to act with full authority <br /> for the Contractor. This individual shall be responsible for the supervision, overall administration, and <br /> coordination of all required services. The Contractor shall provide the name(s) and telephone number(s) <br /> of the Project Foreman(s) within two weeks after contract award date. The Contractor shall provide <br /> written notice to the Director in advance of any change of the Project Foreman. The Project Foreman shall <br /> be able to understand, speak, read, and write the English language as is necessary for the fulfillment of the <br /> <br /> terms of the Agreement. The Project Foreman shall return all calls from the Director within two hours. <br /> 9 <br /> 25C-11 <br /> <br />