monthly payment due the Contractor, or if the amount is insufficient to cover payment, the Contractor <br /> shall be liable for said deficiency and will be billed accordingly. The Director, or his authorized <br /> representative shall decide all questions, which may arise as to the manner of performance and <br /> completion per schedule, acceptable fulfillment of the Agreement by the Contractor, interpretation of the <br /> specifications, and compensation, including completion of work by alternate sources. <br /> C.1.3.11 Subcontractors <br /> C.1.3.11.1 Designation of Subcontractors. In accordance with the provisions of Section 4100 and <br /> subsequent section of the Government Code concerning the Subletting and Subcontracting Fair Practices <br /> Act, bids on public contracts and for all work except the construction, improvement, or repair of streets or <br /> highways and bridges shall include a listing of all subcontractors who will perform work or labor or <br /> render service to the prime contractor's total bid. This requirement for the listing of subcontractors also <br /> extends to that portion of street or highway work involving street lighting and traffic signals as noted in <br /> Section 4100.5. The portion of work, which will be done by each such subcontractor, must be listed and <br /> only one such subcontractor shall be listed for each portion. <br /> C.l .3.1 1.2 Failure to Specify Subcontractors. If the bidder fails to specify a subcontractor for any <br /> portion of the work to be performed under the contract in excess of one-half of one percent of the bidder's <br /> total bid, he agrees to perform that portion himself. The successful bidder shall not, without the written <br /> consent of the city: <br /> a. Substitute any person or firm as subcontractor in place of the subcontractor designated in the <br /> original bid. <br /> b. Permit any subcontract to be assigned or transferred or allow it to be performed by anyone <br /> other than the original subcontractor listed in the bid. <br /> c. Subcontract any portions of the work after bid is submitted if the cost thereof exceeds one- <br /> half of one percent of the total bid and a subcontractor was not designated for the work in the <br /> original bid. <br /> <br /> C.l .6 Hours of Operation <br /> <br /> C.1.6.1 Normal Hours of Operation. Normal operating hours shall be from 6:30a.m. to 6:00 <br /> p.m. Sunday through Saturday. <br /> <br /> C.1.7 Conservation of Utilities. The Contractor shall familiarize himself and require his <br /> <br /> employees to become familiar and comply with standard operating procedures that comply with <br /> <br /> conservation regulations. Compliance with Energy Conservation best practice includes: <br /> a. Instructing personnel to conserve energy by turning off unneeded equipment and utilities <br /> (including electricity and water). <br /> b. Using lights only in areas where work is actually being performed. <br /> c. Allowing adjustment of mechanical equipment controls for heating, ventilation, and air <br /> conditioning systems only by authorized workers. <br /> d. Turning off water faucets or valves after required usage has been accomplished. <br /> 12 <br /> 25C-14 <br /> <br />