Laserfiche WebLink
9. Attachment No. 3 "Agronomic Plan" to the Agreement shall be amended to read as <br />set forth in Attachment No. 3 to this Amendment. <br />10. Attachment No. 5 " Annual Color Planting" shall be amended to provide the <br />following schedule for work to the be completed: <br />Summer -First Week of July <br />Fall- First Week of October <br />Winter -First Week of January <br />Spring -First Week of March <br />11. Contractor shall provide Extra Greens Maintenance as set forth in Attachment No. I <br />to this Amendment. <br />12. Contractor shall include maintenance of the Cabrillo Tennis Center- TwissBassler <br />House planters depicted in Attachment No. 2 to this Amendment in accordance with <br />standard specifications for planter maintenance. Additionally, Contractor shall no <br />wash the courts at the Cabrillo Tennis Center. <br />13. Attachment No. 7 to the Agreement "Plant Cap" shall be amended to read as set forth <br />in Attachment No. 4 to this Amendment. <br />14. The following additional terms shall be added to Exhibit A to the Agreement. <br />Replanting - Plant Material <br />The Contractor shall plant each year, in any area determined by the Director, 64 <br />count flats of 2" plugs of plant species at appropriate spacing so as to achieve <br />complete coverage once the plant is 2 /3rds mature. The Contractor shall be <br />responsible for the complete removal and replacement of plants lost due to normal <br />attrition or due to Contractor's failure to perform under the terms of this is <br />Agreement City is responsible for cost of replacing plants lost to vandalism; <br />however Contractor must prove that it was vandalism that killed the plant. See <br />Attachment 7, as amended, for plant cap. <br />2. Replanting — Shrub <br />The Contractor shall plant each year in any area determined by the Director, 1 <br />gallon shrubs at an appropriate spacing so as to achieve complete coverage once <br />the plant is 2 /3rds mature. The Contractor shall also be responsible for the <br />complete removal and replacement of plants lost due to normal attrition or due to <br />Contractor's failure to perform under the terms of this Agreement. City is <br />responsible for cost of replacing plants lost to vandalism; however, Contractor <br />must prove that it was vandalism that killed the plant. See Attachment 7 for plant <br />cap. <br />