Laserfiche WebLink
Estimated Entity Funded Prior <br />Description of Improvement <br />Cost (2004 Responsible to Indicated <br /> <br />Dollars) For Triggering <br /> Im rovement Event Cash <br />6. Restripe: (1) WB Santa Clara to provide $50,000 Owner Building <br />one LT lane and one shared LT/RT lane; Permit <br />(2) NB Grand Avenue from Fruit Street to <br />14th Street at Santa Ana Blvd/I-5 HOV <br />ramps to provide three NB travel lanes; (3) <br />I-5 NB off-ramps to provide a WB LT lane, <br />a shared LT/RT lane and a RT lane at <br />Grand Ave. <br />7. Remove existing on-street parking stalls $300,000 Owner Building <br />and parking meters on Main Street from Permit <br />Civic Center Dr. to Buffalo St.., restripe <br />and slurry seal this Main Street segment to <br />provide three NB and two SB travel lanes, <br />and construct median on Main St. south of <br />10th Street. <br />8. Acquire necessary ROW and construct $6,500,000 Owner, Final Map <br />southbound RT lane at Main/ 17" and unless City <br />Broadway/17th, including striping, traffic undertakes per <br />signal modification, and ADA compliant section 5.1.1 <br />wheel chair ramps. <br />9. Implement neighborhood traffic plans to $1,200,000 City Six month <br />mitigate changes in traffic patterns or (actual cost, prior to <br />increased cut through traffic resulting from not an issuance of <br />the One Broadway Plaza Project in French estimate) the first <br />Park, French Court, Willard, Floral Park, certificate of <br />West Floral Park, and Washington Square occupancy but <br />Neighborhoods. Traffic plans costs shall no later than <br />include traffic studies, staff time to process 22 month <br />neighborhood traffic plan, and the from the 1 st <br />construction of appropriate semi-diverters, building <br />diagonal diverters, and street closures. permit <br />Ordinance No. NS- <br />Page 10 <br />11A-10