Laserfiche WebLink
12-ORA-55-6.8-6.9 <br />EA: OH290 <br />District Agreement 12-0624 <br />SCOPE SUMMARY <br /> <br /> <br />a <br /> <br />? <br /> <br />m <br /> <br />n <br /> <br />oo c <br />o <br />° <br /> <br />O U) <br />zZ <br />OC <br />J <br />Q <br />V <br /> <br />? <br />C <br />N <br /> <br />Z <br />5 270 Construction Engineering and General Contract <br />Administration X X <br /> 10 Construction Staking Package and Control X <br /> 15 Construction Stakes X <br /> 20 Construction Engineering Work X <br /> 25 Construction Contract Administration Work X <br /> 30 Contract Item Work Inspection X <br /> 35 Construction Material Sampling and Testing X X <br /> 05 Materials Sampling and Testing for Quality Assurance X <br /> 10 Plant Inspection for Quality Assurance X <br /> 15 Independent Assurance Sampling and Testing X <br /> 20 Source Inspection X <br /> 40 Safety and Maintenance Reviews X <br /> 45 Relief From Maintenance Process X <br /> 55 Final Inspection and Acceptance Recommendation X <br /> 60 Plant Establishment Administration X <br /> 65 Transportation Management Plan Implementation During <br />Construction <br />X <br /> 75 Resource Agency Permit Renewal and Extension <br /> <br />Requests <br />X <br /> 80 Long-Term Environmental Mitigation/Mitigation <br />Monitoring During Construction Contract <br />X <br /> 99 Other Construction Engineering and General Contract <br />Administration X <br /> <br />5 <br />285 <br />Contract Change Order Administration X <br />5 290 Resolve Contract Claims X <br />5 295 Accept Contract, Prepare Final Construction Estimate, <br /> <br />and Final Report <br />X <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />PACT Version 9.1 3.31 .08 <br />16 of 17 <br />23A-20